Laserfiche WebLink
Demonstration of Compliance Climax Molybdenum Company <br /> With Regulation 41 Permit M-1977-493 <br /> 2.0 BACKGROUND INFORMATION <br /> 2.1 Well Construction Summary <br /> Groundwater monitoring data are not available for all monitoring locations prior to January 31, <br /> 1994. To provide a summary of the range of available data, Table 2-1, below, presents a <br /> summary of well construction information, including the date of construction of each well within <br /> the existing groundwater monitoring network. <br /> Table 2.1: Monitoring Well Construction Summary <br /> Date of To of Casin Ground Surface Well Depth Screened Casin <br /> Well Latidude Longitude P 9 P 9 <br /> Construction Elevation(ft.) Elevation(fL) ft.BGS interval(BGS) Diameter(in:) <br /> Arkansas River Watershed <br /> Arwell 9/30/1993 39.36154 1 •106.19566 lo,908 10,905 39.0 10.OJ8.5 2 <br /> ARK-MW-001D 9/8/2012 39.36163 1 -106.19566 149.9 59.5-149.9 4 <br /> ARK-MW-002S 8/25/2012 39.36115 1 -106.18155 11,018 11,015 30.0 14.2-24.6 4 <br /> ARK-MW-002D 8/26/2012 39.36114 1 -106.18152 1 11,018 1 11,015 1 197.1 76.9-186.9 4 <br /> Eagle River Watershed <br /> EVMW 9/29/1993 E39.401 <br /> -106.19566 - 10,779 11.5 4.0-11.0 2 <br /> EVMW-IS 10/3/2011 -106.22173 10,786 10,784 24.5 8.9-24.2 2 <br /> EVMW-ID 9/30/2011 -106.22175 10,786 10,785 149.0 103.2-143.2 2 <br /> EVMW-2 9/20/2011 -106.21424 11,104 11,102 200.0 43.2-188.2 2 <br /> EVMW-3S 9/25/2011 -106.23757 10,379 10,378 24.0 8.5-23.8 2 <br /> EVMW-3D 9/27/2011 39.40110 106.23756 10,380 10,379 151.2 41.0.146.0 2 <br /> EV-MW-004 9/12/2012 39.40147 -106.22339 10,796 10,794 209.9 160.0-209.9 4 <br /> Tenmile Creek Watershed <br /> GW#2 6/30/1987 39.45285 -106.15024 10,271 10,269 68.0 20.0-60.0 4 <br /> TM-MW-002D 9/27/2012 39.45281 -106.15028 10,270 10,269 153.6 93.4-153.6 4 <br /> TM-MW-001D 9/22/2012 39.44548 -106.15953 10,368 10,365 201.5 121.1-201.5 4 <br /> GW#1 6/26/1987 1 39.44552 -106.15947 10,367 10,364 97.0 20.0-50.0 4 <br /> Notes: <br /> Wells in bold font are Point of Compliance(POC)wells <br /> BGS=Below Ground Surface <br /> BTOC=Below top of casing <br /> Horizontal Datum:WGS 1984 <br /> Vertical Datum: GEOID 09 <br /> Of the established POC monitoring wells, only wells ARwell in the Arkansas River Watershed, <br /> and GW#2 in the Tenmile Creek Watershed, were in existence in January 1994. Although not a <br /> POC location, monitoring well EVMW, in the Eagle River Watershed, was constructed in late <br /> 1993. In 2011, Climax constructed a shallow(alluvial)and deep(bedrock)well pair approximately <br /> 20 feet upgradient of EVMW. The POC wells in the Eagle River Watershed were more recently <br /> constructed in 2011 or 2012, and the additional deep bedrock POC wells in the Arkansas River <br /> and Tenmile Creek Watersheds were constructed in 2012. <br /> 2.2 Water Quality Data <br /> A statistical data summary for POC wells, based on the methodology in Section 5.1 of the WQMP <br /> (mean concentration plus two standard deviations), are in Appendix A. Appendix B provides a <br /> complete listing of data, organized by watershed, for all monitoring wells identified in the WQMP. <br /> December2016 3 <br />