My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-08_INSPECTION - C1981010
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981010
>
2016-12-08_INSPECTION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2016 8:42:33 AM
Creation date
12/9/2016 8:04:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Inspection
Doc Date
12/8/2016
Doc Name
Inspection Report
From
DRMS
To
Trapper Mining, Inc
Inspection Date
11/16/2016
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 16, 2016 C-1981-010/Trapper Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 7 <br /> <br />Ponds <br />W/D = Holding <br />water/Discharging <br /> Pond Maintenance Items in green <br />Horse W <br />West Horse W <br />West Flume dry <br />Middle Flume #1 W Cleaned in June 2016, pond cleaned <br />material has been seeded <br />Middle Flume #3 W <br />East Middle Flume W <br />East Flume W (puddle) burrows at top of spillway have <br />been filled in <br />Deer dry proposed to be released with SL 17 <br />Ute W <br />Deal W <br />Far East Buzzard <br />dry <br />animal burrows need to be filled in <br />around the embankment of the <br />outfall <br />Coyote dry <br />No Name #2 W/D wood in emergency spillway has <br />been cleared <br />No Name #4 W/D new trash rack <br />No Name #5 W/D vegetation has been cleaned from <br />spill way to flume <br />Johnson #6 <br />W/D <br />Removed old drop pipe materials <br />and finished repairs on new trash <br />rack/outer ring guard <br />Johnson #7R W/D vegetation has been cleaned from <br />spill way <br />Johnson #8R W/D spillway cement has been repaired <br />Johnson #9 W/D spillway cement has been repaired <br />and vegetation removed <br />Johnson #10R W/D Rip-rap hauled in to repair slump <br />along fence <br />West Pyeatt #1 W <br />West Pyeatt #2 dry <br />Middle Pyeatt #1 dry Spillway has been cleaned <br />Middle Pyeatt #2 dry Spillway has been cleaned <br />Middle Pyeatt #3 dry Spillway has been cleaned <br />East Pyeatt #1 W/D <br />East Pyeatt #2 W/D <br />East Pyeatt #3 W/D Spring and Pond discharging at the <br />Flume
The URL can be used to link to this page
Your browser does not support the video tag.