Laserfiche WebLink
Comment 9: Membrane splicing. No notes on the Sections discuss the splicing of the <br /> rubber membrane. Note D.1 on Sheet 3 indicates the continuous membrane is to be <br /> accomplished with a vulcanized splice. Please confirm there will be no "overlap"splices <br /> and add at least a general note referring to note D.1 for splices on the sections drawing. <br /> Response 9: CC&V made the requested change. See added note on general sheet. <br /> Comment 10: What measures does CC&V intend to take to inspect/ensure long term <br /> reliability of the proposed secondary containment system? <br /> Response 10: CC&V will visually inspect the proposed secondary containment <br /> system to ensure long term reliability. <br /> I believe the responses above address the concerns conveyed to us within your adequacy review <br /> comments. Should you require further information please do not hesitate to contact Erik Munroe <br /> at(719) 689-4156 or Erik.Munroe@newmont.com or Meg Burt at (719) 689- 4055 or <br /> Meg Burt a,newmont.com. <br /> Regards, <br /> Meg Burt <br /> Senior Environmental Manager <br /> Cripple Creek and Victor Mining Company <br /> MB/eam <br /> File <br /> Enc—Secondary Containment Calculations <br /> Secondary Containment Drawings <br />