Laserfiche WebLink
December 1, 2016 C-1996-083/Bowie No. 2 Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 4 of 5 <br /> <br /> <br /> <br />Gob Pile #3 <br />No material was being placed on Gob #3 at the time of the inspection. The pile was stable with no issues noted at <br />the time of the inspection. <br /> <br />Gob Pile #4 <br />This Gob Pile has been reclaimed and was observed as being stable with no problems noted at the time of the <br />inspection. As noted under the Gob Pile #2 heading, material has been placed to tie into the east side of the Gob <br />#4 Pile. <br /> <br /> <br /> <br />DOCUMENTS RECEIVED - NA <br />OTHER (SPECIFY) - NA <br /> <br />