My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-05_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2016-12-05_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2016 8:45:58 AM
Creation date
12/6/2016 7:37:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
12/5/2016
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
12/1/2016
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 1, 2016 C-1996-083/Bowie No. 2 Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 5 <br /> <br /> Pond J <br /> <br />Ditches and culverts throughout the facilities area were stable with no problems noted at the time of the inspection. <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES – Rule 4.10 and 4.11 Drainage Control; Surface <br />Stabilization; Placement: <br /> <br />Due to the idle condition of the site, gob placement will be minimal moving forward. <br /> <br />Gob Pile #1 <br />Gob Pile #1 has been inactive. Technical Revision No. 97 was approved and provides a variance from the <br />requirement of Rule 4.10.4(4) for 0.2 acres of Gob Pile #1 where the slope was identified as being greater than 2:1. <br /> <br />Gob Pile #2 <br />Gob Pile #2 was wet due to recent snows but compacted in areas with no active grading operations. Out slopes of <br />bench #4 continue to be covered with cover material. No topsoil has been placed on the out slopes as of the date <br />of this inspection. The slopes are stable with no signs of instability. Soil lay-down is ongoing up to gob #4 and <br />near the east side of the pile at the time of the inspection. Fresh waste material was being placed on Gob #2 at the <br />time of the inspection.
The URL can be used to link to this page
Your browser does not support the video tag.