My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-02_INSPECTION - C1992081
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1992081
>
2016-12-02_INSPECTION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2016 7:16:55 AM
Creation date
12/5/2016 6:48:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Inspection
Doc Date
12/2/2016
Doc Name
Inspection Report
From
DRMS
To
Hayden Gulch Terminal
Inspection Date
11/30/2016
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 30, 2016 C-1992-081/Hayden Gulch Loadout JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 4 of 6 <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />Infraction Number: CV2016002 <br /> Inspection Date: September 9, 2016 <br /> Date Issued: September 20, 2016 <br /> Primary Topic: Gen. Compliance With Mine Plan <br /> Secondary Topic: <br /> Tertiary Topic: <br /> Description: Failure to contain surface disturbance within the permit area boundary. <br /> Abatement #: 1 <br /> Abatement Due Date: 10/21/2016 <br /> Abatement Due Extended Date: 12/8/2016 <br /> Abatement Description: Submit a revision to the permit to incorporate the two affected areas into <br />the permit area boundary in accordance with Rule 2.08.4(2)(c). <br />Include a reclamation plan and seed mix for the affected areas. <br />Please provide a sedimentology demonstration that shows that the disturbed areas will not contribute <br />additional sediment outside the disturbance area accordance with Rule 4.05.2(3) and 4.05.5. <br />Please provide applicable bond for the increased disturbance area. <br /> <br /> Abatement #: 2 <br /> Abatement Due Date: 9/28/2016 <br /> Abatement completed Date: 9/26/2016 <br /> Abatement Description: Clear Ditch 3 of material or install a culvert to allow flow in Ditch 3. <br /> <br /> <br />HGT submitted a request to Vacate this NOV on November 8, 2016. The letter provided a commitment <br />regarding mitigation measures that would be completed. This inspection documents that all the items <br />outlined in the November 8, 2016 letter have been completed with the exception of removal of metal <br />scrap. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.