November 30, 2016 C-1992-081/Hayden Gulch Loadout JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 2 of 6 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection <br />R - Availability of Records <br />N - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Compliance With Mine Plan <br />N - Other <br />NA - Processing Waste <br /> <br />R - Roads <br />R - Reclamation Success <br />N - Revegetation <br />NA - Subsidence <br />N - Slides and Other Damage <br />N - Support Facilities On-site <br />Y - Signs and Markers <br />NA - Support Facilities Not On-site <br />N - Special Categories Of Mining <br />N - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a partial inspection condicted by Janet Binns of CDRMS. Miranda Blomquist accompanied the <br />inspection and represented HGT.The weather was cold but clear. There was a thin covering of snow, approx. 2-4 <br />inches, of snow on the ground. Reclamation work on the rail loop has been temporarily halted, but a fencing crew <br />was on site, re-installing fence on the State owned property. <br />AVAILABILITY OF RECORDS – Rule 5.02.4(1): <br /> During the October 2016 complete inspection, ground water sampling records for 2016 were not located <br />with the permit records at the Foidel Creek location. HGT personnel had printed out the groundwater sampling <br />records for 2016, and had them available for review in the office. Groundwater sampling was conducted on May <br />11, 206 for the Spring sampling and on September 18, 2016 for the Fall sampling. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13;; <br />Impoundments 4.05.6, 4.05.9; <br /> The truck loop pond was holding a shallow pool of water that was frozen and snow covered several feet <br />below the discharge elevation. <br /> <br />Ditch 3 at the facilities area laydown has been reestablished. <br /> <br />HGT has better defined the ditch south of the Brooks driveway to direct flow from the seep into the culvert under <br />the driveway. This configuration appears to be working well. The driveway was firm and not muddy. <br /> <br />The Walker ditch was still flowing. Protective wattles remain in place. <br /> <br />The ditch immediately north of the Walker ditch that passes through RRC-11 remains blocked on the east side. <br />HGT needs to assure that all irrigation ditches are functional prior to ditch owners needing to utilize them. <br />