My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-29_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2016-11-29_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 12:57:17 PM
Creation date
12/1/2016 12:55:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
11/29/2016
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining, Inc
Permit Index Doc Type
Findings
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2. Summary of Parcels in SL -17 proposed bond release <br />IV. OBSERVATIONS AND FINDINGS <br />The criteria that must be met for a Phase III Bond Release are completion of the period of extended liability, <br />revegetation success, suitability of land for the post -mining land use and restoration of the hydrologic balance. <br />Period of Extended Liability <br />The period of extended liability is a minimum of ten years for the Trapper Mine. Reclamation for the <br />proposed Phase III parcels was completed between 2001 and 2005. Vegetation surveys were completed as <br />per Rule 4.15.7(5). There was no additional work performed at the mine site that would extend the liability <br />period. Drainage collection ditch removal and reclamation are exempt from a minimum liability period under <br />Section 3.03.1(5). Division finds that the Trapper Mine meets the requirement of section 3.02.3 for a 10 -year <br />liability period for vegetation. <br />Trapper Mine Page 7 November, 2016 <br />Phase III Bond Release (SL -17) <br />distribution <br />map <br />Phase I <br />Phase I <br />Phase II <br />Phase II <br />Topsoil <br />Seed <br />Parcel <br />acres <br />of acres <br />sheet <br />SL <br />date <br />SL <br />date <br />Topsoil <br />Verification <br />Year <br />Seed Mix <br />11/21/ <br />A -C -04A <br />3.4 <br />3.4 <br />1 <br />SL -8 <br />SL -9 <br />12/2/2008 <br />2004 <br />12" and 10" <br />2004 <br />Range Site C <br />2008 <br />A -C-05 <br />7.1 <br />7.1 <br />1 <br />SL -8 <br />11/21/ <br />SL -16 <br />1/21/2015 <br />2005 <br />14"+ <br />2005 <br />Range Site <br />2008 <br />A/B <br />D -AB -02 <br />16.0 <br />16.0 <br />1 <br />SL -5 <br />6/11/2 <br />SL -9 <br />12/2/2008 <br />2002 <br />15.6" and <br />2002 <br />Range Site <br />004 <br />14.5" <br />A/B <br />D -AB -03 <br />70.8 <br />70.8 <br />1 <br />SL -8 <br />11/21/ <br />SL -9 <br />12/2/2008 <br />2003 <br />16" <br />2003 <br />Range Site <br />2008 <br />A/B <br />11/21/ <br />13.9" and <br />Range Site <br />D-13-04 <br />16.4 <br />16.4 <br />1 <br />SL -8 <br />SL -9 <br />12/2/2008 <br />2004 <br />2004 <br />2008 <br />13.2" <br />A/B <br />D -C-04 <br />21.8 <br />21.4 &.4 <br />1 <br />SL -8 <br />11/21/ <br />SL -9 <br />12/2/2008 <br />2004 <br />13.9" and <br />2004 <br />Range Site <br />2008 <br />13.2" <br />A/B <br />6/14/2 <br />2001 <br />F -AB -01 <br />39.6 <br />23.3,15.8, <br />2 <br />SL -5 <br />SL -6 <br />9/6/2005 <br />2001 <br />17.4 <br />and <br />97-02AB <br />004 <br />2002 <br />F -AB -02 <br />28.5 <br />14.6, 13.9 <br />2 <br />SL -5 <br />6/14/2 <br />SL -9 <br />12/2/2008 <br />2002 <br />14.6" and <br />2002 <br />Range Site <br />004 <br />16.5" <br />A/B <br />F -AB -03 <br />36.3 <br />18.3, 18 <br />2 <br />SL -8 <br />11/21/ <br />SL -9 <br />12/2/2008 <br />2004 <br />12.5" and <br />2003 <br />Range Site <br />2008 <br />11.5" <br />A/B <br />F -AB -04 <br />34.8 <br />19.7, 1.8, <br />2 <br />SL -8 <br />11/21/ <br />SL -9 <br />12/2/2008 <br />2004 <br />16.0" and <br />2004 <br />Range Site <br />.9, 12.4 <br />2008 <br />13.0" <br />A/B <br />F -AB -05 <br />72,4 <br />56.2, 10.5, <br />2 <br />SIL -8 <br />11/21/ <br />SL -12 <br />3/27/2012 <br />2005 <br />17" and 14" <br />2005 <br />Range Site <br />5.7 <br />2008 <br />A/B <br />11/21/ <br />14"+ and <br />H -C-03 <br />20.4 <br />20.4 <br />2 <br />SL -8 <br />SL -9 <br />12/2/2008 <br />2003 <br />2003 <br />Range Site C <br />2008 <br />12.9" <br />11/21/ <br />16"+ and <br />H -C-04 <br />41.0 <br />26.2 & 14.8 <br />2 (1) <br />SL -8 <br />SL -9 <br />12/2/2008 <br />2004 <br />2004 <br />Range Site C <br />2008 <br />12.4" <br />2 and <br />11/21/ <br />14"+ and <br />Range Site <br />Z -AB -05 <br />38.7 <br />9.9, 28.5 <br />SIL -8 <br />SL -12 <br />3/27/2012 <br />2005 <br />2005 <br />3 <br />2008 <br />19" <br />A/B <br />Deer pond <br />1.2 <br />1 <br />Total <br />448.4 <br />IV. OBSERVATIONS AND FINDINGS <br />The criteria that must be met for a Phase III Bond Release are completion of the period of extended liability, <br />revegetation success, suitability of land for the post -mining land use and restoration of the hydrologic balance. <br />Period of Extended Liability <br />The period of extended liability is a minimum of ten years for the Trapper Mine. Reclamation for the <br />proposed Phase III parcels was completed between 2001 and 2005. Vegetation surveys were completed as <br />per Rule 4.15.7(5). There was no additional work performed at the mine site that would extend the liability <br />period. Drainage collection ditch removal and reclamation are exempt from a minimum liability period under <br />Section 3.03.1(5). Division finds that the Trapper Mine meets the requirement of section 3.02.3 for a 10 -year <br />liability period for vegetation. <br />Trapper Mine Page 7 November, 2016 <br />Phase III Bond Release (SL -17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.