Laserfiche WebLink
November 2, 2016 C-1981-033/Bear Mine LDS <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 8 <br /> <br />All seed had been spread using a trailer mounted hydro-seeder (which was not on-site at the time of the <br />inspection). <br />Work was complete on the sediment pond. The Emergency spillway had been lowered as far as possible <br />without compromising the river bank and the primary spillway had been plugged and buried. <br />McCollum’s intended to replace the concrete barriers with a gate before leaving the site. <br /> <br />SLIDES and DAMAGE - Rule 4.12: <br /> Smoke/steam was clearly visible from 3 distinct locations on the scarpe above the slide area, however <br />there was no evidence of any recent slide activity. <br /> <br /> <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />N/A