"CC&V is evaluating an alternative design for a stream bypass system that will intercept <br /> the flow in Poverty Gulch above that location, convey it around the mine to the Poverty <br /> Gulch streambed and discharge the flow into Poverty Gulch using a suitable energy <br /> dissipation structure". CC&V must commit in writing to the Division that no surface <br /> mining activity (including topsoil stripping and overburden removal) will take place within <br /> 400 feet of Poverty Gulch until a technical revision is submitted and approved by the <br /> Division for an acceptable reclamation/closure design alternative to the pipeline. <br /> Newmont's response to Adequacy Review Comment number 56 on September 28, 2016 is as <br /> follows: <br /> Response: The design of the Globe Hill mine area was approved by the Division under <br /> Amendment 10. As pointed out by the Division above, Newmont is evaluating alternative <br /> designs for managing stormwater in Poverty Gulch once the North Cresson mine area is <br /> developed. We agree that a pipeline is not an acceptable permanent alternative for reclamation <br /> or closure design. This alternative was envisioned as a temporary measure for routing <br /> stormwater during the development of the Glove Hill mine area. Newmont will continue to <br /> evaluate alternative designs for stormwater management in Poverty Gulch and will commit to <br /> discussing these alternatives with DRMS in advance of submitting a technical revision for this <br /> activity. <br /> During a meeting with DRMS on November 9, 2016 a verbal agreement was made that <br /> Newmont would submit a TR to Amendment 10 outlining a stormwater diversion structure to <br /> allow Globe Hill Pit preparation and mining activities to occur within the 400 foot buffer <br /> described above. The proposed stormwater diversion channel is further described below. <br /> Stormwater Design <br /> The Globe Hill Pit design takes the northwest corner of the pit across a small section of Poverty <br /> Gulch. It is important to note, that Poverty Gulch has been identified in Amendment 10 to have <br /> historically little to no flow, however, in order to ensure mining activity does not impede any <br /> stormwater flow, Newmont proposes the installation of an inlet collection structure, a diversion <br /> channel, and an outlet structure (Figure 1). The inlet collection structure will be placed in the <br /> drainage above where the pit intersects the gulch and will include wing walls to funnel flow into <br /> the channel (Figure 2). The 5 foot wide and 2 foot deep clay lined diversion channel with rip-rap <br /> will carry collected stormwater around the edge of the future pit to an outlet energy dissipation <br /> structure below where the pit intersects the gulch returning stormwater flow into the gulch <br /> (Figure 2). <br /> The design of the proposed stormwater diversion channel has taken into consideration existing <br /> and future topography of the area under conditions of a 100-year 24-hour stormwater event. <br /> The 100-year 24-hour event as defined in Amendment 10 is 3.5 inches and the total watershed <br /> contribution is 74 acres. A conservative approach was taken for the runoff calculation assuming <br /> 0% infiltration. This calculation estimates the 100 year 24-hour storm event will result in a <br /> maximum calculated flow of 11 cubic feet per second reporting to the channel. Due to site <br /> equipment capability and construction methods the channel design has a calculated capacity of <br /> 74 cubic feet per second providing an additional factor of safety. The channel will be 525 feet in <br /> length with a 65 foot elevation change from diversion inlet to diversion outlet resulting in a total <br /> gradient of 12.5%. <br />