My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-23_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
2016-11-23_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 10:47:46 AM
Creation date
11/29/2016 10:46:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
11/23/2016
Doc Name
Proposed Decision & Findings (SL9)
From
DRMS
To
Snowcap Coal Company, Inc
Permit Index Doc Type
Findings
Email Name
JLE
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.70 Minutes <br />Scraper I Push Dozer I Source <br />Altitude Adi: 1 1.000 1 NA I (CAT HB) <br />Site Altitude: 4850 feet <br />Net Correction: I 0.830 I NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) Grade <br />(%) <br />Roll. Res Total Res <br />(%) % <br />Velocity (fpm) Travel Time <br />(min) <br />1 <br />1900.00 2.00 <br />5.00 7.00 <br />944 2.06 <br />2 <br />200.00 15.00 <br />5.00 20.00 <br />270 0.66 <br />HaulTime: 2.72 minutes <br />Return Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity (fpm) Travel Time <br />(min) <br />1 200.00 -15.00 <br />5.00 <br />-10.00 <br />1514 0.20 <br />2 1900.00 -2.00 <br />5.00 <br />3.00 <br />2666 0.81 <br />Return Time: <br />1.01 <br />minutes <br />Total Scraper teamcycle time: <br />5.33 <br />minutes <br />Adjustedforjob conditions: <br />191.54 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjustedsingle scraperteam(unit) hourly production: <br />383.08 <br />LCY/Hour <br />Adjusted multiple scraperteam(fleet) hourly production: <br />383.08 <br />LCY/Hour <br />Unadjusted unit production/hour: 230.77 LCY/Hour <br />Optimal Numberof Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Tea n(s) Totaljobtime: 7.58 Hours <br />Unitcost: $1.330 /LCY <br />Totaljob cost: $3,864 <br />C-1981-041, SL -09 Findings Document Page 27 of 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.