My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-23_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
2016-11-23_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 10:47:46 AM
Creation date
11/29/2016 10:46:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
11/23/2016
Doc Name
Proposed Decision & Findings (SL9)
From
DRMS
To
Snowcap Coal Company, Inc
Permit Index Doc Type
Findings
Email Name
JLE
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: Topsoil 1.2 Acre CRDA 1 Access Road, 2.4 acre Pond 6 & 10 <br />Permit Action: Post SL8 Cost <br />Site: Roadside Portals Estimate Pennit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task#: 107 State: Colorado Abbreviation: None <br />Date: 12/3/2015 County: Mesa Filename: 0041-107 <br />Us er: JLE <br />Agencyororganizationname: DRMS <br />Equipment Des <br />-Scraper: I Cat 623G <br />-Dozer: I NA <br />Area: I NA <br />-Water Truck: <br />COSTShift basis: 1 per day <br />Cost Breakdown: Scraper Work Team SupportEauipment MaintenanceEauipment <br />Total work team cos t/hour: $509.66 <br />MATERIAL OUANTITIES <br />Initial volume: 2,904 CCY Swell factor: 1.000 <br />Loosevolume: 2,904 LCY <br />Source ofestimatedvolume: Exhibits 9A, 913, 51 and 52 <br />Source ofestimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$75.81 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$140.00 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripperop. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$39.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$254.83 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NumberofUnits: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$509.66 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cos t/hour: $509.66 <br />MATERIAL OUANTITIES <br />Initial volume: 2,904 CCY Swell factor: 1.000 <br />Loosevolume: 2,904 LCY <br />Source ofestimatedvolume: Exhibits 9A, 913, 51 and 52 <br />Source ofestimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />G 1981-041, SL -09 Findings Document Page 26 of 79 <br />ScraperBowl (volume) Basis: <br />Material weight: <br />2,550 lbs/LCY <br />Struck Volume: <br />18.00 <br />LCY <br />Material description: <br />Earth - Dry packed <br />Heaped Volume: <br />23.00 <br />LCY <br />Rated Payload: <br />55,200 pounds <br />Average Volume: <br />20.50 <br />LCY <br />Payload Capacity: <br />21.65 LCY <br />Adjusted Capacity: <br />20.50 <br />LCY <br />G 1981-041, SL -09 Findings Document Page 26 of 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.