Laserfiche WebLink
Mr. Jerald Schnabel <br />November 23, 2016 <br />Page 2 <br />m:\min\tc1\_el paso\m-73-07 daniels sand pit 2\tr05 wash pond\m-73-07sg-tr05ltrofconcerns2016-11-23.docx <br /> Final reclamation configuration shows an 8-foot upstream embankment height <br />allowing permanent water storage leading to stability concerns and potential need for <br />an augmentation plan, <br /> Thirty-day TR review period is too short for the complexity of the proposed revision, <br /> Finally, the TR was submitted by Transit Mix Concrete Co. The site is actually <br />permitted as a Continental Materials Corporation operation. <br />The Division is interested in performing a site visit to discuss some of these issues. Please coordinate <br />with the appropriate technical experts as to what day (preferably in December) would be feasible for <br />the necessary parties. If you have any questions or need further information, please contact me at <br />(303)866-3567 x8169. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Timothy A. Cazier, P.E. <br />Environmental Protection Specialist <br /> <br />ec: Wally Erickson, DRMS <br /> DRMS file <br /> Brandon Heser, Transit Mix <br /> Bruce Humphries, Regulatory Permits Management, Inc.