Abandonment
<br />DRMS Bond
<br />Drill Holes DMRS Diameter/
<br />Depth
<br />Report
<br />Hole ID
<br />AKA
<br />Release Status
<br />Released Insp Date Surface
<br />Depth
<br />Sealed
<br />Pad Area
<br />Road Area
<br />Map 09 Identifier
<br />Permitting Action
<br />For Drill Pad
<br />Casing
<br />Acres
<br />Acres
<br />Yes
<br />GVB-10U-1
<br />GVB-10U
<br />Phase I, II
<br />Phase I, 11, III Aug. 4-6, 2015
<br />9.625/14
<br />1738
<br />1738
<br />0
<br />0
<br />180,183
<br />230
<br />0.5
<br />0
<br />TR53
<br />Yes
<br />HC -08-01
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />12.75/14
<br />230
<br />230
<br />0.5
<br />186
<br />185 (0.4 Ac) was not ci
<br />N/A
<br />HC -08-02
<br />MW -82
<br />N/A
<br />187
<br />Permitted under MR -8
<br />Terror Creek Shaft
<br />1
<br />TR65
<br />N/A
<br />GEOTECH HOLE
<br />N/A
<br />3.8
<br />700
<br />1
<br />195
<br />Eliminated by Shaft Cc
<br />Terror Creek Shaft
<br />TR -67
<br />Ventilation Shaft
<br />N/A
<br />18.5 Feet
<br />550
<br />195
<br />10 GVBs 3 exploration
<br />holes
<br />18174
<br />13
<br />7.5
<br />TR73
<br />Yes
<br />GVB-B12E
<br />Phasel
<br />Aug. 4-6, 2015
<br />7/9.625/14
<br />865
<br />12211
<br />0.9
<br />220,232
<br />Yes
<br />GVB-81313
<br />Phasel
<br />Aug. 4-6,2015
<br />7/9.625/14
<br />1216
<br />970
<br />1
<br />0.3
<br />221,233
<br />Yes
<br />GVB-B13C
<br />Phase 1, 11
<br />Aug. 4-6,2015
<br />7/9.625/14
<br />1120
<br />891
<br />1
<br />0
<br />222
<br />Yes
<br />GVB-B13D
<br />Phasel
<br />Aug. 4-6,2015
<br />7/9.625/14
<br />1057
<br />959
<br />1
<br />0
<br />223
<br />Yes
<br />GVB-B13E
<br />Phasel
<br />Aug. 4-6,2015
<br />7/9.625/14
<br />1407
<br />918
<br />1
<br />0
<br />198
<br />Yes
<br />GVB-B14A
<br />Phasel
<br />Aug. 4-6, 2015
<br />7/9.625/14
<br />1235
<br />995
<br />1
<br />0.9
<br />224,234
<br />Yes
<br />GVB-B1413
<br />Phasel
<br />Aug. 4-6, 2015
<br />7/9.625/14
<br />1510
<br />1251
<br />1
<br />0.4
<br />225,235
<br />Yes
<br />GVB-B14C
<br />Phasel
<br />Aug. 4-6, 2015
<br />7/9.625/14
<br />1430
<br />11921
<br />1
<br />1.1
<br />226,236
<br />Yes
<br />GV13-B14D
<br />Phasel
<br />Aug. 4-6, 2015
<br />7/9.625/14
<br />1305
<br />1035
<br />1
<br />0.4
<br />227,237
<br />Yes
<br />GVB-B14E
<br />Phasel
<br />Aug. 4-6, 2015
<br />7/9.625/14
<br />1310
<br />1048
<br />1
<br />0.4
<br />228,238
<br />Yes
<br />SS -7
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />7/9.625/14
<br />1947
<br />1947
<br />1
<br />1.9
<br />229,239
<br />Yes
<br />SS -6
<br />Phasel
<br />Aug. 4-6, 2015 8.625/5.5/12.
<br />1807
<br />1807
<br />1
<br />0.9
<br />230,240
<br />Yes
<br />2012-1
<br />Phase 1, 11
<br />Aug. 4-6, 2015
<br />9.625/7
<br />1965
<br />1965
<br />1
<br />0.3
<br />231,241
<br />9260
<br />71
<br />3.2
<br />TR78
<br />Yes
<br />GVB-B14F
<br />Phasel
<br />Aug. 4-6,2015
<br />7/9.625/14
<br />1145
<br />1119
<br />1
<br />0.20
<br />248,254
<br />Yes
<br />GVB-B15A
<br />Seeded
<br />Notlnsp
<br />9.375
<br />1150
<br />1
<br />0.30
<br />287,255
<br />TR -90 Road and Depth
<br />Yes
<br />GVB-B15B
<br />Seeded
<br />Notlnsp
<br />9.375
<br />1400
<br />1
<br />0.20
<br />251,256
<br />Yes
<br />GVB-B15C
<br />Seeded
<br />Notlnsp
<br />9.375
<br />1415
<br />1
<br />1.00
<br />250,257
<br />Yes
<br />GV13-B15D
<br />Seeded
<br />Notlnsp
<br />9.375
<br />1580
<br />1
<br />0.401
<br />252,258
<br />Yes
<br />GVB-1316A
<br />Seeded
<br />Notlnsp
<br />9.375
<br />1230
<br />1
<br />0.16
<br />249,259
<br />Yes
<br />SS -8
<br />Phasel
<br />Aug. 4-6, 2015
<br />9.625/7/14
<br />1340
<br />1340
<br />1
<br />0.90
<br />253,260
<br />17884
<br />13
<br />4.17
<br />TR86
<br />Yes
<br />GVB-16B
<br />GVB-8166
<br />Seeded
<br />Notlnsp
<br />9.375
<br />1710
<br />1.0
<br />0.60
<br />262,272
<br />Yes
<br />GVB-16C
<br />GVB-816C
<br />Seeded
<br />Notlnsp
<br />9.375
<br />1670
<br />1.0
<br />0.51
<br />263,273
<br />Yes
<br />GVB-16D
<br />GVB-13161)
<br />Seeded
<br />Notlnsp
<br />9.375
<br />1705
<br />1.0
<br />0.00
<br />264,274
<br />Yes
<br />GVB-17A
<br />GV13-B17A
<br />Seeded
<br />Notlnsp
<br />9.375
<br />880
<br />1.0
<br />1.01
<br />265,275
<br />Yes
<br />GVB-178
<br />GVB-6176
<br />Seeded
<br />Notlnsp
<br />9.375
<br />9801
<br />1.0
<br />0.00
<br />276
<br />GVB-17C
<br />GVB-B17C
<br />Open
<br />Notlnsp
<br />9.375
<br />1090
<br />1.0
<br />0.23
<br />267,277
<br />GVB-17D
<br />GVB-B17D
<br />Open
<br />Not Insp
<br />9.375
<br />1300
<br />1.0
<br />0.93
<br />268,278
<br />GVB-17E
<br />GVB-B17E
<br />Open
<br />Notlnsp
<br />9.375
<br />1620
<br />1.0
<br />0.15
<br />269,279
<br />GVB-19A
<br />GVB-1319A
<br />Deleted TR -108
<br />Not Insp
<br />9.375
<br />1095
<br />1.0
<br />0.49
<br />270,280
<br />GVB-19B
<br />GVB-B19B
<br />Deleted TR -108
<br />Not Insp
<br />9.375
<br />1075
<br />1.0
<br />0.25
<br />271,281
<br />N/A
<br />2014 -SS -A
<br />N/A
<br />9.3751
<br />1715
<br />1
<br />1.0
<br />0.00
<br />282
<br />DELETED TR -96
<br />Yes
<br />2014 -SS -B
<br />2014 -SS -10
<br />Phasel
<br />Aug. 4-6, 2015
<br />8.625
<br />1616
<br />1616
<br />1.0
<br />0.00
<br />283
<br />Yes
<br />2014 -SS -C
<br />2014 -SS -11
<br />Phasel
<br />Aug. 4-6, 2015
<br />8.625
<br />1428
<br />1428
<br />1.0
<br />0.00
<br />284
<br />2890
<br />2.0
<br />1.05
<br />TR -90
<br />GVB-17F
<br />GVB-B17F
<br />Open
<br />9.375
<br />1660
<br />1.01
<br />0.60
<br />266,285
<br />TR -86 Road
<br />GVB-19C
<br />GVB-B19C
<br />Deleted TR -108
<br />9.375
<br />1230
<br />1.0
<br />0.451
<br />267,286
<br />1.01
<br />0.46
<br />MR -164
<br />CWI-DH-58A
<br />Mon Well
<br />Open
<br />1
<br />8.751
<br />5501
<br />1.01
<br />0.461
<br />289
<br />TR -108 2.05-45vii 08/16
<br />instructed
<br />nstruction
<br />
|