Abandonment
<br />DRMS Bond
<br />Drill Holes
<br />DMRS
<br />Diameter/
<br />Depth
<br />Report
<br />Hole ID
<br />AKA
<br />Release Status
<br />Released
<br />Insp Date
<br />Surface
<br />Depth
<br />Sealed
<br />Pad Area
<br />Road Area
<br />Map 09 Identifier Permitting Action
<br />For Drill Pad
<br />Casing
<br />Acres
<br />Acres
<br />5 GVBs, 2 exploration
<br />10020
<br />3
<br />3.1
<br />TR23
<br />Yes
<br />GVB-D-BC
<br />GVB-DB-C
<br />Reclaimed
<br />Not Insp
<br />5.5/10
<br />1000
<br />77
<br />0.5
<br />1.0
<br />087, 086, 088
<br />Yes
<br />GVB-D-BB
<br />GVB-DB-B
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />5.5/10
<br />1270
<br />487
<br />0.5
<br />0.6
<br />090, 089
<br />Yes
<br />GVB-D-9B
<br />GVB-D-9A
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />5.5/12
<br />1090
<br />5041
<br />0.5
<br />0.8
<br />092,091, 093
<br />Yes
<br />GVB-D-BA
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />7.625/10
<br />1222
<br />274
<br />0.5
<br />0.5
<br />094,100
<br />GVB-D-9A
<br />Phase I, II
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />6
<br />1290
<br />094
<br />IP99-16
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />6
<br />1960
<br />0.5
<br />096
<br />N/A
<br />IP99-14
<br />N/A
<br />0.5
<br />97 Deleted
<br />N/A
<br />IP99-17
<br />N/A
<br />97 Deleted
<br />N/A
<br />IP99-11
<br />N/A
<br />Phase I, II, III
<br />6
<br />1810
<br />0.2
<br />102,101 Not drilled will be dele
<br />5 exploration
<br />26271
<br />2.5
<br />TR25
<br />Yes
<br />P -8 -BURN -22
<br />N/A
<br />Phase I, 11, III
<br />Aug. 4-6, 2015
<br />6
<br />417
<br />417
<br />0.5
<br />129
<br />Yes
<br />P -B -BURN -23
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />6
<br />490
<br />490
<br />0.5
<br />130
<br />N/A
<br />P -TC -03-01
<br />TC -03-01
<br />6
<br />580
<br />0.5
<br />131 Mon Well
<br />N/A
<br />P -TC -03-02
<br />TC -03-02
<br />6
<br />580
<br />0.5
<br />133 Mon Well
<br />Yes
<br />P -TC -03-03
<br />TC -03-03
<br />N/A
<br />Phase I, 11, III
<br />Aug. 4-6, 2015
<br />3
<br />560
<br />512
<br />0.5
<br />133
<br />4 exploration
<br />1
<br />3135
<br />1
<br />0.5
<br />0
<br />TR28
<br />N/A
<br />P -TC -03-04
<br />TC -03-04
<br />N/A
<br />6
<br />760
<br />134 DELETED TR -32
<br />N/A
<br />P -TC -03-05
<br />TC -03-05
<br />N/A
<br />6
<br />795
<br />135 DELETED TR -32
<br />N/A
<br />P -TC -03-06
<br />TC -03-06
<br />N/A
<br />6
<br />840
<br />0.5
<br />136 DELETED TR -96
<br />N/A
<br />P -TC -03-07
<br />TC -03-07
<br />N/A
<br />6
<br />740
<br />137 DELETED TR -32
<br />3 GVBs adjust 3 exploration
<br />3680
<br />21
<br />TR32
<br />Deleted P -TC -03-04, 5 -
<br />Yes
<br />GVB-Bl-A
<br />GVB-Bl-B
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.875
<br />8801
<br />170 Drilled from existing drill si
<br />141
<br />Yes
<br />GVB-Bl-B
<br />GVB-Bl-C
<br />Phase I, II
<br />Phase I, 11, III
<br />Aug. 4-6, 2015
<br />6.625
<br />1160
<br />575 Drilled from existing drill si
<br />141
<br />Yes
<br />GVB-Bl-C
<br />GVB-Bl-D
<br />Phase 1, II
<br />Phase I, 11, III
<br />Aug. 4-6, 2015
<br />9.875
<br />1640
<br />120
<br />Drilled from existing drill si
<br />141
<br />3 GVBs
<br />3520
<br />1.5
<br />0.9
<br />TR41
<br />Yes
<br />GVB-62-A1
<br />GVB-62-A
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />6.625/9.625
<br />1384
<br />135
<br />0.5
<br />147
<br />Yes
<br />GVB-B3-A1
<br />GVB-133-13
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/16
<br />1072
<br />134
<br />0.5
<br />149
<br />Yes
<br />GVB-B3-A2
<br />GVB-B3-A
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/161
<br />1064
<br />1211
<br />0.5
<br />0.9
<br />148,150
<br />0.5
<br />0.0
<br />TR41- Bowie No. 1 MI
<br />DRMS estimate w/PR:
<br />BRL-1-03-01
<br />Phase I, II, III
<br />6
<br />1480
<br />0.5
<br />2.1
<br />197,200
<br />0.5
<br />1.1
<br />TR49 - Bowie No. 1 MI
<br />DRMS estimate w/PR:
<br />N/A
<br />BRL-1-08-03
<br />N/A
<br />8.75
<br />1520
<br />0.5
<br />0.4
<br />198,201 DELETED TR -96
<br />Yes
<br />BRL-1-08-04
<br />Open
<br />Not Insp
<br />8.751
<br />1870
<br />1
<br />0.5
<br />0.7
<br />199,202
<br />Hubbard Creek Shaft
<br />I
<br />TR -47
<br />Ventilation Shaft
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />10.5 Feet
<br />500
<br />13 GVBs
<br />13672
<br />5.00
<br />15.80
<br />ITR52
<br />Ref TR -65 for deleted holes Map 9
<br />Yes
<br />GV13-9C
<br />Phase I, II
<br />Aug. 4-6, 2015
<br />9.625/14
<br />1741
<br />1450
<br />1
<br />14
<br />174, 182
<br />Yes
<br />GV13-8A
<br />GVB-B-BA
<br />Phase I, II
<br />1 Aug. 4-6, 2015
<br />7/9.625
<br />790
<br />790
<br />1
<br />0.9
<br />176,184
<br />Yes
<br />GVB-9D
<br />Phase I, II
<br />Phase I, 11, III
<br />Aug. 4-6, 2015
<br />9.625/16.5
<br />1024
<br />1024
<br />0
<br />0
<br />176, 184
<br />Yes
<br />GVB-10D-1
<br />Phase 1, 11
<br />Aug. 4-6,2015
<br />9.625/14
<br />1698
<br />15301
<br />11
<br />0
<br />177
<br />Yes
<br />GVB-10D-2
<br />GVB-10C
<br />I Phase 1, II
<br />Phase I, 11, 111
<br />Aug. 4-6, 2015
<br />9.625/14
<br />1760
<br />1400
<br />0
<br />0
<br />177
<br />Yes
<br />GVB-8B
<br />GVB-DB-B
<br />Phase 1, 11
<br />Aug. 4-6,2015
<br />9.625/14
<br />1622
<br />1610
<br />1
<br />0
<br />179
<br />GVB-9E
<br />I Phase I, II
<br />Phase I, 11, III
<br />Aug. 4-6, 2015
<br />9.375
<br />1660
<br />0
<br />0
<br />179
<br />Yes
<br />GVB-10E
<br />I Phase I, II
<br />Aug. 4-6, 20151
<br />9.625/14
<br />1639
<br />1376
<br />1
<br />0.9
<br />180, 183
<br />TR -108 2.05-45vi 08/16
<br />ted
<br />D5 & 07
<br />
|