Laserfiche WebLink
Abandonment <br />DRMS Bond <br />Drill Holes <br />DMRS <br />Diameter/ <br />Depth <br />Report <br />Hole ID <br />AKA <br />Release Status <br />Released <br />Insp Date <br />Surface <br />Depth <br />Sealed <br />Pad Area <br />Road Area <br />Map 09 Identifier Permitting Action <br />For Drill Pad <br />Casing <br />Acres <br />Acres <br />5 GVBs, 2 exploration <br />10020 <br />3 <br />3.1 <br />TR23 <br />Yes <br />GVB-D-BC <br />GVB-DB-C <br />Reclaimed <br />Not Insp <br />5.5/10 <br />1000 <br />77 <br />0.5 <br />1.0 <br />087, 086, 088 <br />Yes <br />GVB-D-BB <br />GVB-DB-B <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/10 <br />1270 <br />487 <br />0.5 <br />0.6 <br />090, 089 <br />Yes <br />GVB-D-9B <br />GVB-D-9A <br />Phase I, II <br />Aug. 4-6, 2015 <br />5.5/12 <br />1090 <br />5041 <br />0.5 <br />0.8 <br />092,091, 093 <br />Yes <br />GVB-D-BA <br />Phase I, II <br />Aug. 4-6, 2015 <br />7.625/10 <br />1222 <br />274 <br />0.5 <br />0.5 <br />094,100 <br />GVB-D-9A <br />Phase I, II <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />6 <br />1290 <br />094 <br />IP99-16 <br />Phase I, II <br />Aug. 4-6, 2015 <br />6 <br />1960 <br />0.5 <br />096 <br />N/A <br />IP99-14 <br />N/A <br />0.5 <br />97 Deleted <br />N/A <br />IP99-17 <br />N/A <br />97 Deleted <br />N/A <br />IP99-11 <br />N/A <br />Phase I, II, III <br />6 <br />1810 <br />0.2 <br />102,101 Not drilled will be dele <br />5 exploration <br />26271 <br />2.5 <br />TR25 <br />Yes <br />P -8 -BURN -22 <br />N/A <br />Phase I, 11, III <br />Aug. 4-6, 2015 <br />6 <br />417 <br />417 <br />0.5 <br />129 <br />Yes <br />P -B -BURN -23 <br />Phase I, II <br />Aug. 4-6, 2015 <br />6 <br />490 <br />490 <br />0.5 <br />130 <br />N/A <br />P -TC -03-01 <br />TC -03-01 <br />6 <br />580 <br />0.5 <br />131 Mon Well <br />N/A <br />P -TC -03-02 <br />TC -03-02 <br />6 <br />580 <br />0.5 <br />133 Mon Well <br />Yes <br />P -TC -03-03 <br />TC -03-03 <br />N/A <br />Phase I, 11, III <br />Aug. 4-6, 2015 <br />3 <br />560 <br />512 <br />0.5 <br />133 <br />4 exploration <br />1 <br />3135 <br />1 <br />0.5 <br />0 <br />TR28 <br />N/A <br />P -TC -03-04 <br />TC -03-04 <br />N/A <br />6 <br />760 <br />134 DELETED TR -32 <br />N/A <br />P -TC -03-05 <br />TC -03-05 <br />N/A <br />6 <br />795 <br />135 DELETED TR -32 <br />N/A <br />P -TC -03-06 <br />TC -03-06 <br />N/A <br />6 <br />840 <br />0.5 <br />136 DELETED TR -96 <br />N/A <br />P -TC -03-07 <br />TC -03-07 <br />N/A <br />6 <br />740 <br />137 DELETED TR -32 <br />3 GVBs adjust 3 exploration <br />3680 <br />21 <br />TR32 <br />Deleted P -TC -03-04, 5 - <br />Yes <br />GVB-Bl-A <br />GVB-Bl-B <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.875 <br />8801 <br />170 Drilled from existing drill si <br />141 <br />Yes <br />GVB-Bl-B <br />GVB-Bl-C <br />Phase I, II <br />Phase I, 11, III <br />Aug. 4-6, 2015 <br />6.625 <br />1160 <br />575 Drilled from existing drill si <br />141 <br />Yes <br />GVB-Bl-C <br />GVB-Bl-D <br />Phase 1, II <br />Phase I, 11, III <br />Aug. 4-6, 2015 <br />9.875 <br />1640 <br />120 <br />Drilled from existing drill si <br />141 <br />3 GVBs <br />3520 <br />1.5 <br />0.9 <br />TR41 <br />Yes <br />GVB-62-A1 <br />GVB-62-A <br />Phase I, II <br />Aug. 4-6, 2015 <br />6.625/9.625 <br />1384 <br />135 <br />0.5 <br />147 <br />Yes <br />GVB-B3-A1 <br />GVB-133-13 <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/16 <br />1072 <br />134 <br />0.5 <br />149 <br />Yes <br />GVB-B3-A2 <br />GVB-B3-A <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/161 <br />1064 <br />1211 <br />0.5 <br />0.9 <br />148,150 <br />0.5 <br />0.0 <br />TR41- Bowie No. 1 MI <br />DRMS estimate w/PR: <br />BRL-1-03-01 <br />Phase I, II, III <br />6 <br />1480 <br />0.5 <br />2.1 <br />197,200 <br />0.5 <br />1.1 <br />TR49 - Bowie No. 1 MI <br />DRMS estimate w/PR: <br />N/A <br />BRL-1-08-03 <br />N/A <br />8.75 <br />1520 <br />0.5 <br />0.4 <br />198,201 DELETED TR -96 <br />Yes <br />BRL-1-08-04 <br />Open <br />Not Insp <br />8.751 <br />1870 <br />1 <br />0.5 <br />0.7 <br />199,202 <br />Hubbard Creek Shaft <br />I <br />TR -47 <br />Ventilation Shaft <br />Phase I, II <br />Aug. 4-6, 2015 <br />10.5 Feet <br />500 <br />13 GVBs <br />13672 <br />5.00 <br />15.80 <br />ITR52 <br />Ref TR -65 for deleted holes Map 9 <br />Yes <br />GV13-9C <br />Phase I, II <br />Aug. 4-6, 2015 <br />9.625/14 <br />1741 <br />1450 <br />1 <br />14 <br />174, 182 <br />Yes <br />GV13-8A <br />GVB-B-BA <br />Phase I, II <br />1 Aug. 4-6, 2015 <br />7/9.625 <br />790 <br />790 <br />1 <br />0.9 <br />176,184 <br />Yes <br />GVB-9D <br />Phase I, II <br />Phase I, 11, III <br />Aug. 4-6, 2015 <br />9.625/16.5 <br />1024 <br />1024 <br />0 <br />0 <br />176, 184 <br />Yes <br />GVB-10D-1 <br />Phase 1, 11 <br />Aug. 4-6,2015 <br />9.625/14 <br />1698 <br />15301 <br />11 <br />0 <br />177 <br />Yes <br />GVB-10D-2 <br />GVB-10C <br />I Phase 1, II <br />Phase I, 11, 111 <br />Aug. 4-6, 2015 <br />9.625/14 <br />1760 <br />1400 <br />0 <br />0 <br />177 <br />Yes <br />GVB-8B <br />GVB-DB-B <br />Phase 1, 11 <br />Aug. 4-6,2015 <br />9.625/14 <br />1622 <br />1610 <br />1 <br />0 <br />179 <br />GVB-9E <br />I Phase I, II <br />Phase I, 11, III <br />Aug. 4-6, 2015 <br />9.375 <br />1660 <br />0 <br />0 <br />179 <br />Yes <br />GVB-10E <br />I Phase I, II <br />Aug. 4-6, 20151 <br />9.625/14 <br />1639 <br />1376 <br />1 <br />0.9 <br />180, 183 <br />TR -108 2.05-45vi 08/16 <br />ted <br />D5 & 07 <br />