Laserfiche WebLink
Push gradient: 1.000 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.902 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.3537 <br /> <br />Adjusted unit production: 746.48 LCY/hr <br />Adjusted fleet production: 746.48 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.337/LCY <br /> <br />Total job time: 0.30 Hours <br />Total job cost: $75 <br /> <br />