My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-02_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2016-11-02_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2016 12:34:01 PM
Creation date
11/16/2016 11:26:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
11/2/2016
Doc Name
Cost Estimate
From
DRMS
To
Scott Wanstedt
Type & Sequence
TR70
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> <br />Task description: Backfill and Grade B Seam Dewatering System #2 Upper Pond <br />Site: Deserado Mine Permit Action: TR 70 Permit/Job#: C1981018 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 11/2/2016 County: Moffat Filename: C018-001 <br />User: CCW <br />Agency or organization name : DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine : Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type : Semi-Universal <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown : <br /> Utilization % <br />Ownership Cost/Hour: $97.48 NA <br />Operating Cost/Hour: $103.60 100 <br />Ripper own. Cost/Hour: $10.74 NA <br />Ripper op. Cost/Hour: $0.99 15 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $251.70 <br />Total Fleet Cost/Hour: $251.70 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 177 <br />Swell factor: 1.250 <br />Loose volume: 221 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 2,110.5 LCY/hr <br /> <br />Materials consistency description: Compacted fill or embankment 0.9 <br /> <br />Average push gradient: 0 % <br />Average site altitude: 5,600 feet <br /> <br />Material weight: 2,550 lbs/LCY <br /> <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.700 (FND-MF)
The URL can be used to link to this page
Your browser does not support the video tag.