My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-07_REVISION - M1980244 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-11-07_REVISION - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 4:02:17 PM
Creation date
11/9/2016 10:15:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/7/2016
Doc Name
Adequacy Review Response (hard copy)
From
Newmont / CC&V
To
DRMS
Type & Sequence
TR83
Email Name
TC1
ERR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> i <br /> I <br /> Comment 2: Please commit to making the spill reports available on-site for the Division <br /> to review during site inspections. These reports should include the information from the <br /> samples taken of the spilled material and the soil matrix. <br /> i <br /> Response 2: Newmont commits to making spill reports, specific to the unlined haul <br /> road, available to Division representatives, including sampling results for both the <br /> spilled and surrounding material. <br /> Comment 3: Please clarify what quantity of spilled material will initiate the Spill <br /> Response Plan and clean up. <br /> Response 3: Any material spillage will initiate the SPCC. <br /> Comment 4: Under the Spill Response Plan header of TR-83, the Operator states that <br /> decontamination will be conducted on the SGVLF using a water truck cannon to spray <br /> out the beds and buckets of contaminated equipment. Please verify that this <br /> decontamination activity will only occur over the liner system. <br /> Response 4: Newmont verifies decontamination activity will only occur over the liner <br /> system. <br /> Comment S: During the August 20, 2016 meeting between CC&V and the Division, it <br /> became known that when haul trucks enter the SGVLF, they drive over ore that has yet to <br /> be leached so there is no contact between the sodium cyanide solution and the haul truck <br /> tires. Additionally, if haul trucks must pass over leached material, a three foot lift of fresh <br /> material would be brought in prior to entering that area. Please commit that all haul <br /> truck traffic will occur on top of at least three feet of fresh, un-leached material at all <br /> times when in the SGVLF. <br /> Response 5: Newmont commits that all haul truck traffic will occur on top of at least <br /> three feet of fresh, un-leached material at all times when in the SGVLF. <br /> Comment 6: Under the SGVLF Sequencing and Schedule header of TR-83, the Operator <br /> states that Phase II is planned to be completed in Q3 of 2020 and the liner will <br /> completely tie-in to Phase I liner and allow haul truck traffic to travel over liner when on <br /> the SGVLFfootprint. Please commit to ensuring that all haul truck traffic will occur over <br /> a liner system when Phase II is completed. Note, this will add a section of the haul road, <br /> approximately 1,200 feet in length, between the LOB and the SGVLFfootprint. This new <br /> liner will need to be tied into or drain into the SGVLF, AGVLF, and HGM liners. <br /> Response 6: Newmont commits to ensuring all haul truck traffic travelling interior <br /> from the edge of the SGVLF liner system which includes Phase I and Phase II,will <br /> occur over a liner system when Phase II of SGVLF is completed. Newmont does not <br /> intend to line the section of haul road from the LOB to the edge of the SGVLF liner <br /> system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.