Laserfiche WebLink
NEWMONT <br /> Newmont Mining Corporation <br /> 6363 South Fiddler's Green Circle Suite 800 <br /> Greenwood Village CO 80111 <br /> T 719-689-2977 <br /> F 719-689-3254 <br /> www ne nriont corn <br /> SENT CERTIFIED, RETURN RECEIPT REQUESTED <br /> 7015-1660-0000-0779-7556 <br /> November 2, 2016 � �V � <br /> Mr. Timothy Cazier, P.E. tAOV O 7 2016 <br /> Environmental Protection Specialist DIVISION OF RECLAMATION <br /> Colorado Department of Natural Resources MINING AND SAFETY <br /> Division of Reclamation, Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> Re: Permit No. M-1980- 44• Cripple Creek & Victor Gold Mining Com an "CC&V" <br /> Cresson Project; — esponse to DRMS Technical Revisio R-83) Preliminary Adequacy <br /> Review for Squaw Gulch Valley Leach Facility (SGVLF) Haul Route to Phase I <br /> Dear Mr. Cazier: <br /> As a follow up to Division of Reclamation, Mining and Safety's (DRMS) October 3I't letter for <br /> preliminary adequacy review comments of technical revision TR-83, please see Newmont's <br /> response to comments in bold and DRMS comments in italics. <br /> Comment 1: To ensure the implementation of the Spill Response Plan,please commit to <br /> inspecting the haul road at least daily for any spilled material when the unlined haul <br /> road is actively being used to haul material to the SGVLF. The Division recommends that <br /> this haul road inspection be conducted by a member of the Sustainability&External <br /> Relations Department. Please commit to making the inspection records available on-site <br /> for the Division to review during site inspections. <br /> Response 1: As part of Newmont's Spill Prevention and Containment and <br /> Countermeasures (SPCC)Newmont commits to inspect the unlined haul road at <br /> least daily for any spilled material. This inspection is an existing component of the <br /> Newmont pit foreman daily responsibilities,with the spill management component <br /> to be added to the existing inspection scope. <br /> Inspection reports will be retained on file and will be made available upon request. <br />