Laserfiche WebLink
P C) <br /> rammomTransit Mix Concrete Co. <br /> RPM,Inc. <br /> (c) Compliance with applicable federal and Colorado dredge and <br /> fill requirements: <br /> This requirement is not applicable to the pond's construction activity since no wetlands will be <br /> impacted. <br /> (d) Remove temporary or large siltation structures from drainage <br /> ways after disturbed area are revegetated and stabilized, if required by the Reclamation <br /> Plan: <br /> This requirement is not applicable to the pond since the structure will not be placed in a drainage <br /> way. <br /> (2) Earthen dams, if necessary to impound water, may be constructed if <br /> the formation of such impoundments will not damage adjoining property or conflict with <br /> water pollution laws, rules or regulations of the federal government,the State of Colorado or with <br /> any local government pollution ordinances: <br /> An earthen embankment is proposed for the site as part of the mining and reclamation plan. This <br /> will be an incised wash fines disposal pond, with a retention embankment on one side, within the <br /> mined out pit area. The proposed embankment out-slope is approximately 30 feet in height and <br /> categorized as a non-jurisdictional structure by the Division of Water Resources. (Please see <br /> Exhibit 2) There is no outlet from the structure. Slurry is delivered to the pond and the sand <br /> settles out. The water is then returned to the Company's processing plant for re-use. Other than <br /> the adjoining slopes, no storm water runoff is directed to the waste disposal pond. <br /> 6.4.4 Mining Plan: <br /> (a) Not applicable <br /> (b) Not applicable <br /> (c) All water diversions and impoundments; and <br /> The only impoundment that is part of this revision is the proposed new waste fines disposal <br /> pond. <br /> (d) Not applicable <br /> 9 <br />