Laserfiche WebLink
\ , RECEWEID <br /> Transit Mix Concrete Co. NOV Q Iwo RPM,Inc. <br /> VIMION OF RECLAMATION <br /> MINING S SAFETY ! <br /> COLORADO DIVISION OF RECLANIATION,MINING AND SAFETY Vjdjako <br /> •�` " 1313 Sherman Street.Rootn 215.Denver.Colorado 80203 pli(303)866-3567 NAB/ 201102 <br /> 0/J 7 J <br /> /876 'Y`V !/�YlOvl <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET <br /> File No.:M- 1973-007SG site Name:Daniels Sand Pit #2 <br /> County El Paso TR# (DR1tS Use onh•) <br /> Peimiittee:Continental Materials Corporation <br /> Operator(If other than Penuittee):Transit Mix Concrete Co. <br /> Pennittee Representative:Mr. Brandon Heser, Transit Mix Concrete Co.(719) 313-0316 <br /> Please provide a brief description of the proposed revision: <br /> Construct a new wash fines pond <br /> As defined by the Minerals Rules,a Technical Revision(TR)is:"a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR. <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days.If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies.the Division must deny the TR unless the <br /> pennittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however,it is up to the penmittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted(mark only one) <br /> 110c, 111, 112 construction materials,and 112 quarries $216 `� <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1.2 or 3) $1006 ❑ <br /> 2 <br />