J. Beck <br />Page 5 <br />1 November 2016 <br />any studies to comply with this Rule, more information regarding the proposed operation will need to be <br />submitted. The Division will need to know exactly where the proposed permit area will be and where the <br />mining operation and its facilities will exist within this area. Based on this information, the Division will <br />then consult with the appropriate State and Federal fish and wildlife management, conservation or land <br />management agencies to determine the level of detail of the study and the areas possibly needed for <br />further study. <br />28. Section 2.04.12 — Prime Farmland Investigation <br />The required information was not submitted. <br />29. Section 2.05.2 — Estimated Area for Life of Operation <br />As per your letter of 28 October 2016, mining is to take place in Section 7, Range 65 West, in Township <br />31 South. However, the Healey Mine operated in Section 8, Range 65 West, Township 31 South. These <br />two areas appear mutually exclusive of each other. Therefore, prior permitting actions for section 8 <br />would not apply. Please inform DRMS what section you intend to conduct mining in. <br />30. Section 2.05.3(5) — Operation Plan — Permit Area — Topsoil <br />The required information was not submitted. There is some topsoil salvage and replacement information <br />contained in the permit file for the original Healey Pit (C-1976-014). However, the new permit area is <br />indicated to be much larger and possibly not within the original Healey Pit area. Regardless, for the new <br />proposed permit area, youmust submit the information required by Rule 2.04.9. Based on the information <br />required for Rules 2.04.5 you will then need to submit information to comply with Rule 2.05.3(5). <br />31. Section 2.05.3(2)(a) — Operation Plan — Permit Area — Operation Description — Surface Mining <br />The required information was not submitted. More information regarding the proposed operation will <br />need to be submitted. The Division will need to know exactly where the proposed permit area will be and <br />where the mining operation and its associated facilities will exist within this area. <br />32. Section 2.05.3(3) — Operation Plan — Permit Area — Mine Facilities <br />The required information was not submitted. More information regarding the proposed operation will <br />need to be submitted. The Division will need to know exactly where the proposed permit area will be and <br />where the mining operation and its associated facilities will exist within this area. <br />33. Section 2.05.3(4) — Operation Plan — Permit Area — Ponds, Impoundments, Other Treatment <br />Facilities, and Diversions <br />The required information was not submitted. More information regarding the proposed operation will <br />need to be submitted. The Division will need to know exactly where the proposed permit area will be and <br />where the mining operation and its associated facilities will exist within this area. <br />34. Section 2.05.3(5) — Operation Plan — Permit Area — Topsoil <br />The required information was not submitted. <br />