Laserfiche WebLink
(2) Estimated costs to reclaim site: <br /> Shaping/Sloping 10 hours @ $115/hr. _ $1150 <br /> Topsoil Application 5 hours @ $115/hr. _ $575 <br /> Seed/Fertilizer 71bs./acre (1 lb.=$9) _ $623.70 <br /> Mulch $55/ton x 2 tons = $110 <br /> Disc/Drilling $45/acre = $445.50 <br /> Operator 30 hours@ $25 = $750 <br /> TOTAL = $3654.20 <br /> Site will be evaluated throughout mining activity to determine maximum <br /> disturbance. <br /> (2)(a) Equipment costs are included in the above estimate with such factors as wages, <br /> depreciation, fuel, lubricant, etc. The applicant owns all equipment needed for <br /> reclamation, which may include, but not limited to graders and dump trucks. <br /> Applicant charges $25/hour for operator for any outside labor completed by the <br /> county. <br /> (2)(b) No detoxification, building demolition, well sealing or stream channel <br /> reconstruction will be required. <br /> (2)(c) Estimate $3654.20 x 18.5% (overhead costs) _ $676.03 <br /> Estimate $3654.20 x 5% (office administration costs) _ $182.71 <br /> Estimate $3654.20 + Overhead $676.03 +Administration $182.71 = $4512.94 <br />