My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-01_INSPECTION - C1981035
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981035
>
2016-11-01_INSPECTION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 7:18:14 AM
Creation date
11/2/2016 6:15:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Inspection
Doc Date
11/1/2016
Doc Name
Inspection Report
From
DRMS
To
GCC Energy, LLC
Inspection Date
10/25/2016
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 25, 2016 C-1981-035/King Coal Mine RDZ <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 4 of 10 <br /> <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br />An inspection of the King II facilities revealed no significant problems. Some inlet grates needed cleaning. The <br />coal pile by Stack Tube #2 was not spilling onto the undisturbed area (a problem in past years). <br /> <br />SIGNS AND MARKERS – Rule 4.02: <br />Near the Burnwell tipples at King I, a permit boundary marker was observed. <br /> <br />Near the King II facilities (north end was observed during this inspection), permit boundary markers need to be <br />changed to disturbance limit markers. <br /> <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />At King I, both Plant Growth Medium Storage Areas require additional maintenance to protect the resource. At the <br />storage area above the Refuse Pile, a small area of the ring ditch still needs to be repaired. At the area above the <br />fan bench, a ring ditch has recently been constructed. However, additional work is needed on the south side of this <br />feature; a sediment sump or other practice should be used to keep the majority of the soil on the pile. <br /> <br />No problems were seen with the Topsoil Stockpiles (TSS) at King II except the presence of some weeds at the <br />TSS by the pond. <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />
The URL can be used to link to this page
Your browser does not support the video tag.