Laserfiche WebLink
3-2.All runoff from the mine area will be contained on site.All runoff from the plant area will be <br /> passed through a designed sedimentation. <br /> 4:3.All topsoil stockpiles will be temporarily seeded so minimize erosion until their use in final <br /> reclamation. <br /> ".The reclamation plan will create a diverse habitat with 4kesa lake, agricultural land and <br /> wetlands which will be valuable for wildlife habitat. <br /> fi-.S.All fuels,grease, lubricants,and other hazardous materials will be stored in approved containers <br /> with containment facilities that protect against spills from contaminating the surrounding <br /> ground and offsite areas. <br /> -7 6.Spray bars on crushing equipment and aggressive watering of haul roads and the plant area will <br /> minimize fugitive dust and its visual impact. <br /> End of 1998 Reclamation Scenario <br /> This section has been deleted In its entirety. <br />