My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - M1980244 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-08-31_REVISION - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 3:51:10 PM
Creation date
10/25/2016 1:35:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
8/31/2016
Doc Name
Specifications - Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR78
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 02710.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />June 15, 2016 <br /> <br /> <br /> <br />Page 3 <br />C. Piping shall be placed to the lines and elevations shown on the DRAWINGS, with no sags <br />or humps, as approved by MANAGER and CERTIFYING ENGINEER. <br />3.2. Pipe Connections <br />A. All connections for non‐perforated pipe shall be watertight under maximum <br />anticipated pressure head. <br />B. The ends of all pipe shall be capped with a manufactured pipe cap. <br />C. HDPE pipe will be butt‐heat‐fusion welded in accordance with the MANUFACTURER's <br />guidelines. <br />D. CPe pipe joints shall conform to MANUFACTURER's recommendations. <br />3.3. Bedding and Backfill <br />A. CONTRACTOR shall place and compact Leak Detection Fill in accordance with Item <br />3.06.E of Section 02200.0. <br />B. CONTRACTOR shall bed and backfill Leak Detection piping with Leak Detection Fill. <br />C. Low Volume and High Volume Solution Collection pipe shall be placed on top of the <br />geosynthetics, as shown on the DRAWINGS. <br />D. Placement of Low Volume and High Volume Solution Collection and High Volume <br />Solution Collection pipes shall be coordinated with other operations such as Low <br />Volume Solution Collection Fill, Bedding Fill, Soil Liner, and Drain Cover fill placement. <br />Equipment access directly on geosynthetics is expressly prohibited. Any damage to the <br />geosynthetics caused by CONTRACTOR during pipe placement shall be repaired at the <br />expense of CONTRACTOR. <br />E. A minimum of 5 feet of Low Volume Solution Collection Fill and Drain Cover Fill shall be <br />placed over the top of the pipe before crossing with rubber‐tired construction <br />equipment. If pipe becomes crushed during or after installation by CONTRACTOR's <br />equipment or methods of construction, the pipe shall be replaced by CONTRACTOR, at <br />no additional cost to CC&V. The CONTRACTOR will be required to demonstrate to <br />MANAGER that the equipment and procedures used are not detrimental to the piping, <br />at no additional cost to CC&V. <br />F. CONTRACTOR shall hold pipes in place with sand bags, or other methods approved by <br />MANAGER, until the Low Volume Solution Collection Fill and Drain Cover Fill has been <br />placed. Directly before placement of the Low Volume Solution Collection Fill and Drain <br />Cover Fill, the sand bags will be removed. <br />G. Secondary or tertiary High Volume Solution Collection pipes will be attached to the <br />primary pipes with plastic ties or other method approved by MANAGER and <br />CERTIFYING ENGINEER.