Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02710.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 2  <br />4. 15‐inch  diameter  "N‐12"  perforated  CPe  pipe,  as  manufactured  by Advanced  <br />Drainage  Systems,  Inc.,  or  an  equivalent  approved  by MANAGER, DESIGN  <br />ENGINEER and CERTIFYING ENGINEER.    <br />5. 18‐inch  diameter  "N‐12"  perforated  CPe  pipe,  as  manufactured  by Advanced  <br />Drainage  Systems,  Inc.,  or  an  equivalent  approved  by MANAGER, DESIGN  <br />ENGINEER and CERTIFYING ENGINEER.  <br />6. 24‐inch  diameter  "N‐12"  perforated  CPe  pipe,  as  manufactured  by Advanced  <br />Drainage  Systems,  Inc.,  or  an  equivalent  approved  by MANAGER, DESIGN  <br />ENGINEER and CERTIFYING ENGINEER.  <br />7. 28‐inch diameter solid SDR 11 HDPE pipe, as manufactured by DRISCOPIPE or an  <br />equivalent approved by MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER.  <br />B. Leak Detection Pipe:  <br />1. 3‐inch  diameter,  "Highway‐Grade"  perforated  CPe  pipe,  as  manufactured  by  <br />Advanced  Drainage  Systems,  Inc.,  or  an  equivalent  approved  by   MANAGER,   <br />DESIGN ENGINEER and CERTIFYING ENGINEER.  <br />2. 3‐inch  diameter,  solid  SDR  13.5  HDPE  pipe  or  an  equivalent  approved  by  <br />MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER.  <br />C. Low Volume Solution Collection Pipe:  <br />1. 18‐inch diameter solid SDR 11 HDPE pipe or an equivalent approved by MANAGER,  <br />DESIGN ENGINEER and CERTIFYING ENGINEER.  <br />2. 4‐inch  "Highway  Grade"  perforated  corrugated  polyethylene  (CPe) pipe, as  <br />manufactured by Advanced Drainage Systems, Inc., or an equivalent approved  by   <br />MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER.  <br />D. Underdrain Pipe:  <br />1. 4‐inch diameter "N‐12" perforated CPe pipe, as manufactured by Advanced Drainage  <br />Systems,  Inc.,  or  an  equivalent  approved  by MANAGER, DESIGN  ENGINEER and  <br />CERTIFYING ENGINEER.  <br />3. PART 3:  EXECUTION  <br />3.1. Installation  <br />A. CONTRACTOR shall install pipe according to MANUFACTURER's recommendations.  <br />B. CONTRACTOR shall  take  all  precautions  necessary  to  not  damage  the  pipe  during  <br />material  placement. CONTRACTOR may  periodically  be  requested  by MANAGER to  <br />verify that covered pipe has not been crushed. Costs associated with proving pipes have  <br />not been crushed shall be borne by CONTRACTOR.