Laserfiche WebLink
October 19, 2016 C-2010-089/New Horizon North Mine BFB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 5 <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br /> Coal was stacked in the coal stockpile area (photo 6). <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and Maintenance <br />4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> The mine roads were being watered during the inspection. <br /> <br />SIGNS AND MARKERS – Rule 4.02: <br /> The topsoil signs for all 4 topsoil piles were in place and easily visible. <br /> <br />The permit boundary signs around the perimeter of the permit area were in place and visible. <br /> <br />Mine identification signs were in place at all mine entrances. <br /> <br />Stream buffer zone signs were in place around Meehan and Glasier Draws. <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> <br />PHOTOGRAPHS <br /> <br /> Photo 1 – Pond 001 East Inlet Photo 2 – Pond 001 West Inlet