Laserfiche WebLink
October 20, 2016 C-1996-083/Bowie No. 2 Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 8 <br /> <br />Gob Pile #3 <br />No activity was observed on the gob pile at the time of the inspection. All equipment was idle on the pile at the <br />time of the inspection. Based on the photographs, there were no signs of erosion or instability of the pile and no <br />problems were noted. <br /> <br />Gob Pile #4 <br />Reclamation of the west side of Gob Pile #4 is completed. Cover material is placed on the three lower benches <br />that have been backfilled and graded to final configuration. The upper bench remains open for additional refuse <br />placement. Topsoil has been placed and erosion control mat is in place. There were no signs of erosion or <br />instability of the area or anywhere on the reclaimed pile. <br /> <br /> <br /> <br />DOCUMENTS RECEIVED - NA <br />OTHER (SPECIFY) - NA <br /> <br />