My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-29_PERMIT FILE - C1981035A (17)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2016-08-29_PERMIT FILE - C1981035A (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 9:36:40 AM
Creation date
10/20/2016 9:44:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
8/29/2016
Section_Exhibit Name
KII Appendix 12 Reclamation Bond Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C1981035 Midterm Review No. 7 Page 6 of 123 <br />BULLDOZER RIPPING WORK <br />Task description: King I - Rip 12" in upper facility area <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 2/11/2015 <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Ripper Attachment: 3 -Shank Ripper <br />State: Colorado <br />County: La Plata <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C035-002 <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Source of estimated quantity: Map King I-007 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />Utilization % <br />Ownership Cost/Hour: <br />$69.05 <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />100 <br />Ripper Operating Cost/Ifour: <br />$7.46 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total Unit Cost/Hour: <br />$222.73 <br />feet <br />Total Fleet Cost/Hour: <br />$222.73 <br />feet <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />Job Condition Correction Factors <br />ieismic: NA Bank Volume: <br />NA <br />BCY NA <br />Area: 1.96 acres Rip Depth (ft): <br />1.00 <br />Volume: 3.162 <br />Source of estimated quantity: Map King I-007 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />1.00 <br />mph <br />Average Ripping Width: <br />7.08 <br />degrees <br />Average Ripping Length: <br />300.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.800 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.800 <br />Acres/hr <br />Site Altitude: <br />7,400 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.66 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.66 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 2.95 <br />BCY or CCY <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.