Laserfiche WebLink
King Mines C1981035 Midterm Review No. 7 Page 5 of 123 <br />Total Cost (adjusted for <br />Job Hours: 40.00 Subtotal (unadjusted): $61,076.77 location): $57,412.16 <br />supports - 5 ft. W x 6 ft. H <br />housing <br />Stacker tower #1 <br />16xl6x5O/1Ox10x50 <br />Bldg. (SN) demo./off-site <br />8,900.00 <br />CF <br />$1.08 <br />$9,603.10 <br />disposal in approved landfill - <br />Max. 15 mile haul <br />Stacker tower #2 <br />8.5xl6x25/8.5x5.5x25 <br />Bldg. (SN) demo./off-site <br />2,284.00 <br />CF <br />$1.08 <br />$2,464.44 <br />disposal in approved landfill - <br />Max. 15 mile haul <br />2 500 gallon fuel tanks <br />NA <br />Haul tank to certified salvage <br />2.00 <br />EA <br />$760.00 <br />$1,520.00 <br />dump - 3,000 to 5,000 gal. tank <br />Bury debris <br />1Ox10x40.5 <br />Push demolished <br />150.00 <br />CY <br />$0.74 <br />$111.00 <br />materials/rubble/debris into pit - <br />Max. 200 ft. push <br />Scale house <br />40x42x1O <br />Bldg. (SN) demo./on-site <br />16,800.00 <br />CF <br />$0.17 <br />$2,923.20 <br />disposal in existing pit or cut - <br />Max. 200 ft. push <br />Total Cost (adjusted for <br />Job Hours: 40.00 Subtotal (unadjusted): $61,076.77 location): $57,412.16 <br />