My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-29_PERMIT FILE - C1981035A (9)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2016-08-29_PERMIT FILE - C1981035A (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 9:00:53 AM
Creation date
10/19/2016 10:08:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
PERMIT FILE
Doc Date
8/29/2016
Doc Name
Reclamation Bond Information/Estimates
Section_Exhibit Name
KI Appendix 12
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C1981035 <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Volume: <br />Midterm Review No. 7 Page 17 of 123 <br />10.00 LCY <br />12.00 LCY <br />11.00 LCY <br />12.00 LCY <br />Final Truck Volume Based on Number of Loader Passes: 11.41 LCY <br />Loading Tool Capacity <br />Rated Capacity: 3.900 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist <br />Adjusted Capacity: 3.803 LCY <br />Bucket Size Class: NA <br />95-100%) 0.975 <br />Job Condition Corrections: Site Altitude (ft.): 7500 feet <br />Truck Loader Source <br />Altitude Ad': 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 3 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />passes <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.483 <br />Cycle Time Factors Factor (min.) <br />minutes <br />Source <br />Material: <br />Material 1/8" to 3/4" diameter -0.02 <br />-0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />Cat HB <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB) <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.090 <br />0.393 <br />0.885 <br />minutes <br />minutes <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: <br />Truck Load Time: <br />Truck Maneuver and Dump Time: <br />Truck Travel (Haul & Return) Time: <br />0.50 Minutes Adjusted for site altitude: 0.500 <br />0.885 Minutes Adjusted for site altitude: 0.885 <br />0.90 Minutes Adjusted for site altitude: 0.900 <br />Road Condition: Rutted dirt, little maintenance, no water. 2" tire penetration 5.0 <br />Minul <br />Minul <br />Minul <br />
The URL can be used to link to this page
Your browser does not support the video tag.