Laserfiche WebLink
September 21, 2016 C-1981-010/Trapper Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 8 <br /> <br />West Flume dry <br />Middle Flume #1 W Cleaned in June 2016, pond cleaned <br />material has been seeded <br />Middle Flume #3 W <br />East Middle Flume W <br />East Flume W (puddle) Inlet erosion, embankment sparse <br />on veg, burrows at top of spillway <br />Deer dry proposed to be released with SL 17 <br />Ute W <br />Deal W <br />Far East Buzzard <br />dry <br />animal burrows need to be filled in <br />around the embankment of the <br />outfall <br />Coyote dry <br />No Name #2 W/D wood in emergency spillway has <br />been cleared <br />No Name #4 W/D new trash rack <br />No Name #5 W/D vegetation has been cleaned from <br />spill way to flume <br />Johnson #6 <br />W/D <br />Removed old drop pipe materials <br />and finished repairs on new trash <br />rack/outer ring guard <br />Johnson #7R W/D vegetation has been cleaned from <br />spill way <br />Johnson #8R W/D spillway cement has been repaired <br />Johnson #9 W spillway cement has been repaired <br />and vegetation removed <br />Johnson #10R W Rip-rap hauled in to repair slump <br />along fence <br />West Pyeatt #1 W <br />West Pyeatt #2 dry Wild Rye in spillway <br />Middle Pyeatt #1 dry Spillway has been cleaned <br />Middle Pyeatt #2 dry Spillway has been cleaned <br />Middle Pyeatt #3 dry Spillway has been cleaned <br />East Pyeatt #1 W/D <br />East Pyeatt #2 W/D <br />East Pyeatt #3 W/D <br />Grouse #1 dry embankment erosion has been <br />repaired <br />Grouse #2 dry <br />Sage #1 dry sand in spillway <br />Sage #2 dry sand in spillway <br />Oak #1 W Spillway has been cleaned <br />Oak #2 W Spillway has been cleaned