My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-13_REVISION - M2001017
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001017
>
2016-10-13_REVISION - M2001017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:33:23 PM
Creation date
10/13/2016 9:16:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001017
IBM Index Class Name
Revision
Doc Date
10/13/2016
Doc Name
Adequacy Review Response
From
Environment, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D MINING PLAN (CONT) <br /> exterior, ditches and access for the oil and gas facilities . The <br /> setback areas will be reclaimed if disturbed and the roads will <br /> remain for access around the final Water Storage Reservoirs . <br /> The mine will be dewatered as explained in the existing <br /> permit text and the material will be mined using loaders and <br /> excavators to remove material from the face . The material will <br /> then be delivered to the Plant for processing, using the loaders , <br /> haul trucks or a conveyor system. <br /> The arrows on EXHIBIT C-1 - MINING PLAN MAP show how we will prog- <br /> ress through the mine area. We estimate that by adding the new <br /> area, the life of the mine will be extended from 10 to 12 years . <br /> Mining Timetable <br /> The continuing uncertainty of economic conditions in the <br /> construction materials industry precludes an accurate forecast of <br /> demand for materials during the life of the mine . We therefore, <br /> can only estimate the mining timetable based on an average year <br /> and may expect a specific year to vary widely from the average . <br /> ACRES ± <br /> AREA* YEARS <br /> TOTAL MINED MISC (I.E. <br /> AREA SETBACKS, O&G <br /> AREAS AND UN- <br /> DISTURBED, <br /> ETC. ) <br /> Area A 1-2 10.6 j 9.6 1.0 <br /> Area B 1;�-2 54 .4 36 .5 17.9 <br /> Area C 10-12 56.4 46 .6 9. 8 <br /> TOTALS 15-20 121.4 92 .7 28.7 <br /> * areas are only used to explain the mining areas,not the direction or timing of <br /> the mining operations. <br /> 7 (revised 8/25/2016) <br />
The URL can be used to link to this page
Your browser does not support the video tag.