My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-03_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-10-03_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 6:56:38 PM
Creation date
10/4/2016 9:15:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/3/2016
Doc Name
Adequacy Review Response
From
Newmont / CC&V
To
DRMS
Type & Sequence
AM11
Email Name
TC1
ERR
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> CRIPPLE CREEK&VICTOR(CC&V)GOLD MINING COMPANY MINE LIFE EXTENSION 2 - TOC <br /> AMENDMENT NO. 11 RECLAMATION COST ESTIMATE <br /> Sheet Note: The TAB Numbers are used for Indexing. They can be selected as Bookmarks on the left margin of the Adobe. df priir <br /> TAB Description of Contents <br /> 28 Mine Area Fencing Costs <br /> 29 Clean-up and Miscellaneous Costs Associated with Closure <br /> 30 Revegetation Repairs and Maintenance <br /> 31 Ancillary Areas Reclamation <br /> 32 Viewshed Conservation <br /> 33 Mobilization and Demobilization Costs <br /> 34 Post-Closure Monitoring of Heap Effluent,Gr.Water,Surf.Water,&Vegetation <br /> 40 Cost Adjustments Using the Consumer Price Index <br /> 41 Conveyor and Stem Wall Demolition Costs Using Means <br /> 42 Production Rates of Reclamation Tasks <br /> 43 Growth Medium Volumes and Haul Model <br /> 44 Tree Planting Acreage by Area <br /> 47 Dozer Costs Over Time and Dozer Costs per Cubic Yard <br /> 48 Cat 623 Scraper-Production Rate Regression Equation <br /> 49 Truck Rental and Operating Costs Over Time <br /> 50 Loader Rental and Operating Costs Over Time <br /> 54 Chicago Tunnel <br /> 55 Mill Platform Reclamation(As-Built July 1,2013) <br /> 57 Cat 740 Articulated Truck Performance <br /> SAlnc Revision 8-10-16-Removed Tab 54b(Providence)and Corrected Tab for Chicago Tunnel <br /> 8/10/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.