Laserfiche WebLink
TABLE OF CONTENTS <br /> CRIPPLE CREEK&VICTOR(CC&V)GOLD MINING COMPANY MINE LIFE EXTENSION 2 - TOC <br /> AMENDMENT NO. 11 RECLAMATION COST ESTIMATE <br /> Sheet Note: The TAB Numbers are used for Indexing. They can be selected as Bookmarks on the left margin of the Adobe. df priir <br /> TAB Description of Contents <br /> 28 Mine Area Fencing Costs <br /> 29 Clean-up and Miscellaneous Costs Associated with Closure <br /> 30 Revegetation Repairs and Maintenance <br /> 31 Ancillary Areas Reclamation <br /> 32 Viewshed Conservation <br /> 33 Mobilization and Demobilization Costs <br /> 34 Post-Closure Monitoring of Heap Effluent,Gr.Water,Surf.Water,&Vegetation <br /> 40 Cost Adjustments Using the Consumer Price Index <br /> 41 Conveyor and Stem Wall Demolition Costs Using Means <br /> 42 Production Rates of Reclamation Tasks <br /> 43 Growth Medium Volumes and Haul Model <br /> 44 Tree Planting Acreage by Area <br /> 47 Dozer Costs Over Time and Dozer Costs per Cubic Yard <br /> 48 Cat 623 Scraper-Production Rate Regression Equation <br /> 49 Truck Rental and Operating Costs Over Time <br /> 50 Loader Rental and Operating Costs Over Time <br /> 54 Chicago Tunnel <br /> 55 Mill Platform Reclamation(As-Built July 1,2013) <br /> 57 Cat 740 Articulated Truck Performance <br /> SAlnc Revision 8-10-16-Removed Tab 54b(Providence)and Corrected Tab for Chicago Tunnel <br /> 8/10/2016 <br />