Laserfiche WebLink
TABLE OF CONTENTS <br /> CRIPPLE CREEK&VICTOR(CC&V)GOLD MINING COMPANY MINE LIFE EXTENSION 2 - TOC <br /> AMENDMENT NO.11 RECLAMATION COST ESTIMATE <br /> Sheet Note: The TAB Numbers are used for Indexing. They can be selected as Bookmarks on the left margin of the Adobe. df prir <br /> TAB Description of Contents <br /> Title Page <br /> TOC Table of Contents <br /> 3 Legend of Colors <br /> 4 Changes <br /> 5 Assumptions <br /> 6 Summary Cost Table for Current Estimate(Previous Summary Table) <br /> 7 Cost Data Entry-Annual Unit Cost Data for Labor,Supplies,Demo,etc. <br /> 8 2015 CC&V Reclamation Labor Rates <br /> 9 2015 CC&V Materials and Services Costs <br /> 10 2015 CC&V Reclamation Equipment Rates <br /> 11 Building Demolition(Separated from Tank demo on former TAB 11) <br /> 11 Fixture DEMO(Separated from Building Demo on former TAB 11) <br /> 12 East Cresson-WildHorse(Excludes WHEX)Mine Reclamation Costs <br /> 13 Wild Horse Extension and Grassy Valley Reclamation <br /> 14 North Cresson Mine Reclamation Costs <br /> 15 Main Cresson Mine Reclamation Costs <br /> 16 East Cresson Overburden Storage Area Reclamation Costs <br /> 17 Squaw Gulch Overburden Storage Area Reclamation Costs <br /> 18 Arequa Gulch(AGVLF)Chemical Closure <br /> 18 Arequa Gulch(AGVLF) Reclamation Costs <br /> 19 Squaw Gulch (SGVLF)Chemical Closure <br /> 19 Squaw Gulch (SGVLF)Reclamation Costs <br /> 20 #3&4 Pads and Ajax Exploration Reclamation Costs <br /> 21 Ironclad Facility and Access Corridor Reclamation <br /> 22 Basins <br /> 23 Monitoring Well and Piezometer Closure Costs <br /> 24 Growth Medium Stockpiles Reclamation Costs <br /> 25 Road Reclamation Costs <br /> 26 Poweriine Removal Costs <br /> 27 Reclamation of Building Footprint Areas <br /> 8/10/2016 <br />