My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_PERMIT FILE - M2016010 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016010
>
_PERMIT FILE - M2016010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2020 4:05:29 PM
Creation date
9/30/2016 12:17:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Permit File
Doc Name
Adequacy Review Response #3
From
Transit Mix Concrete Co.
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ri <br /> Transit Mix Concrete Co. <br /> b. Make appropriate revisions to Figures G-12, F-1 and F-2; and <br /> c. Either confirm the reclamation costs are included in Exhibit L, or provide those costs. <br /> Response: Transit Mix has revised Exhibits G and L to clarify that culverts LTC-CC-2, -3, <br /> and -4 will be completely removed. The contours in Figures C-10, F-1, F-2, and G-12 have <br /> been revised to show the final contours with the culverts removed and open channels <br /> established. The previously submitted reclamation costs included costs for culvert removal, <br /> and Exhibit L has been revised to include the actual excavation volumes. <br /> D) Comment: Exhibit F drawings. Similar to Comment (C) above, culverts LTC-CC-5 & -6 are <br /> also expected to be removed (even though Figure G-12 does not cover that area of the road). <br /> Figures G-6b and c indicate some earthwork is needed to cross those the two drainages. Please: <br /> a. Clarify the need for grading/re-contouring for these culvert removal efforts; <br /> b. Make appropriate revisions to Figures F-1 and F-2; and <br /> c. Either confirm the reclamation costs are included in Exhibit L, or provide those costs. <br /> Response: Transit Mix has revised Exhibits G and L to clarify that culverts LTC-CC-5 and- <br /> 6 will be completely removed. The contours in Figures C-10, F-1, F-2, and G-12 have been <br /> revised to show the final contours with the culverts removed and open channels established. <br /> Figure G-12 includes two sheets (G-12a and G-12b) showing reclamation of the quarry area <br /> and the access road. The previously submitted reclamation costs included costs for culvert <br /> removal,and Exhibit L has been revised to include the actual excavation volumes. <br /> Hitch Rack Ranch Quarry Permit Application M-2016-010 <br /> September 26, 2016 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.