Laserfiche WebLink
locations and service. Please let us know if DRMS would like a statement from Black <br /> Hills Energy regarding impacts to utilities. <br /> 6. Drawing C-4 <br /> • This drawing intended to show proposed facilities shows the historic Chicago Tunnel <br /> underground workings but does not include the proposed underground workings shown <br /> in Drawings C-5a and C-5b. Please show these proposed workings for overall site <br /> reference and indicate where shafts daylight. <br /> RESPONSE. Drawing C-4 has been updated to show the proposed underground <br /> workings (See Attachment 1). <br /> 7. Drawing C4a <br /> • This drawing intended to show changes in disturbance categories but does not indicate a <br /> change in disturbance where the proposed underground workings shafts (as shown in <br /> Drawings C-5a and C-5b)daylight. Please indicate a change in disturbance category <br /> where these shafts daylight. <br /> RESPONSE. There are no plans to construct shafts as part of the underground <br /> workings at the Chicago Tunnel. The vertical structures shown on Drawings C-5a and <br /> C-5b are vent raises to provide ventilation to underground operations. These <br /> structures daylight within a permitted disturbance area already designated as a Mine <br /> Area. Drawing C-4a has been updated to extend the underground mining disturbance <br /> area into the existing surface mine area to include the vent raises (See Attachment 1). <br /> 8. Drawing C 5a <br /> • The legend shows a line color for 2016, 2017 and 2018, but there are no "2020 <br /> Sectional View"on the drawing. Please provide an explanation. <br /> RESPONSE: It is not clear what the Division is asking for in its comment. Please refer <br /> to Drawing C-5b, which shows plan views and sectional views for the years 2019 and <br /> 2020. <br /> • There is a discrepancy between the title block scale(1"=2000')and the scale bar(1 <br /> inch=200 ft). Please provide a corrected drawing. <br /> RESPONSE: Corrected drawing is included in the Attachment 1. <br /> • Sectional views for 2016, 2017 and 2018 show purple and orange lines that are near <br /> vertical shafts. Please show on the plan views where these shafts daylight. <br /> RESPONSE. Drawings C-5a and C-5b have been updated to show where proposed <br /> vent raises daylight on the surface. See Attachment 1. <br /> 9. Drawing C-5b <br /> • There is a discrepancy between the title block scale (1" =2000') and the scale bar(1 <br /> inch=200 ft). Please provide a corrected drawing. <br /> RESPONSE: A corrected drawing C-5b is included in Attachment 1. <br /> • Sectional views show purple and orange lines that are near vertical shafts. Please show <br /> on the plan views where these shafts daylight. <br /> Page 6 of 30 <br />