Laserfiche WebLink
September 19, 2016 C-1996-083/Bowie No. 2 Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 7 of 9 <br /> <br />Creek Vent Shaft has been sealed with a temporary seal. The vent shaft structure has been removed and the shaft <br />opening was fenced. <br /> Terror Creek Vent Shaft <br /> <br />SIGNS AND MARKERS – Rule 4.02: <br /> <br />All signs and markers were in place and in compliance at the time of the inspection. BRL has place signage in <br />compliance with Rule 4.30.1(3) due to the current temporary cessation status of the site. <br /> <br />TOPSOIL – Rule 4.06 Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br />Redistribution 4.06.4: <br /> <br />As noted in the Processing Waste section of this report, cover soil material and topsoil is in the process of <br />placement on Gob Pile #2. No depth measurements were taken during this inspection as material placement is <br />ongoing and not at completed levels. No issues were noted with the placement of soil and placement activities <br />were in compliance with requirements under the permit. <br /> <br /> <br />DOCUMENTS RECEIVED - NA <br />OTHER (SPECIFY) - NA <br /> <br />