Laserfiche WebLink
n <br />u <br />/4/ / /i _ <br />�00 <br />se <br />00 <br />i <br />LEGEND <br />i PERMIT BOUNDARY <br />SECTION LINE <br />MAJOR DRAINAGE BOUNDARY <br />MINOR DRAINAGE BOUNDARY <br />DRAINAGE BOUNDARY <br />�--� DRAINAGE STATIONING <br />0 5 <br />7 DRAINAGE AREAS <br />Note: <br />- <br />See Map 41 B for entire postmining hydrology area. <br />30 <br />Reclaimed Land (CN=75) <br />Undisturbed Land (CN=53) <br />500' 0 500 1000' <br />CONTOUR INTERVAL 25 FT. <br />TOPO DATE: PMT COLLOM PR 04 <br />+ <br />Page Exh. 7-25-8 <br />Postmining Case Hydrologic Assumptions <br />Exhibit 7, Item 25, Figure 5 <br />Badger Draw <br />COA,L <br />DATE 5 <br />SCALE:LdpCp <br />DRWG BY: <br />_ <br />---- <br />. <br />s0��..�� COMPANY <br />V-�i'..ao,�[...osa�Tla�-a'�✓ <br />APPROVED BY <br />DRWGNO. <br />Colowyo Coal Company <br />55731 taxa Ham 13 <br />e ,. C -1.d. 6w1 <br />IIS <br />PR03 <br />Collom LCX Footprint, misc. channels <br />3123111 <br />TCP <br />KRB <br />pRpg <br />UpdW dchannels <br />5/20/11 <br />TCP <br />KRB <br />PR04 <br />Updafed Logo, PMT and channels <br />3108115 <br />TCP <br />KRB <br />