Laserfiche WebLink
'NA <br />0 <br />0 dD 6 <br />6 <br />O ° <br />.....5 00_ )-1-97.2 <br />r00 06 <br />10 <br />15 00 <br />Ac <br />S <br />0 0 <br />31 <br />LEGEND <br />PERMIT BOUNDARY <br />SECTION LINE <br />MAJOR DRAINAGE BOUNDARY <br />MINOR DRAINAGE BOUNDARY <br />DRAINAGE BOUNDARY <br />F--� DRAINAGE STATIONING <br />1 DRAINAGEAREAS <br />Note: <br />See Map 41 B for entire postmining hydrology area. <br />Reclaimed Land (CN=75) <br />Undisturbed Land (CN=63) <br />500• 0 500 1000 <br />CONTOUR INTERVAL 25 FT <br />TOPO: PMT COLLOM PR 04 <br />Page Exh. 7-25-9 <br />Postmining Case Hydrologic Assumptions <br />Exhibit 7, Item 25, Figure 6 <br />Marmot, Weasel and Trib. 5 Draws <br />SCALE: I"= Iwo <br />DATE <br />COAL, DRWG. BY TA <br />COMPANY APPROVED BY <br />v.�M�s.nmuc*1�!-�✓ DRWG NO. <br />Colowyo Coal Company <br />5731 <br />73 l— Hgtlo 81811 <br />PR03 CoII0M LCX Footprint, mist. cI-IS 3/23/11 TCP KRB <br />PR03 Updated channels 5/20/11 TCP KRB <br />PR04 Updated Logo, PMTend channels 3/08/15 TCP KRB <br />N <br />W <br />E <br />S <br />LEGEND <br />PERMIT BOUNDARY <br />SECTION LINE <br />MAJOR DRAINAGE BOUNDARY <br />MINOR DRAINAGE BOUNDARY <br />DRAINAGE BOUNDARY <br />F--� DRAINAGE STATIONING <br />1 DRAINAGEAREAS <br />Note: <br />See Map 41 B for entire postmining hydrology area. <br />Reclaimed Land (CN=75) <br />Undisturbed Land (CN=63) <br />500• 0 500 1000 <br />CONTOUR INTERVAL 25 FT <br />TOPO: PMT COLLOM PR 04 <br />Page Exh. 7-25-9 <br />Postmining Case Hydrologic Assumptions <br />Exhibit 7, Item 25, Figure 6 <br />Marmot, Weasel and Trib. 5 Draws <br />SCALE: I"= Iwo <br />DATE <br />COAL, DRWG. BY TA <br />COMPANY APPROVED BY <br />v.�M�s.nmuc*1�!-�✓ DRWG NO. <br />Colowyo Coal Company <br />5731 <br />73 l— Hgtlo 81811 <br />PR03 CoII0M LCX Footprint, mist. cI-IS 3/23/11 TCP KRB <br />PR03 Updated channels 5/20/11 TCP KRB <br />PR04 Updated Logo, PMTend channels 3/08/15 TCP KRB <br />