Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> <br /> <br />PERMIT INFORMATION <br /> <br /> <br />Permit Number: C-1996-084 <br />Mine Name: Lorencito Canyon Mine <br />Operator: New Elk Coal Company, LLC <br />Operator Address: <br />Mr. Louis Head <br />12250 Highway 12 <br />Weston, CO 81091 <br /> <br /> <br />County: Las Animas <br />Operation Type: Surface <br />Permit Status: Permanent Cessation <br />Ownership: Private <br /> <br />Operator Representative Present: <br />Vince Massarotti <br /> <br />Operator Representative Signature: (Field Issuance Only) <br /> <br />This report was issued electronically from the Division’s Denver Office. <br /> <br /> <br />INSPECTION INFORMATION <br /> <br /> <br />Inspection Start Date: September 14, 2016 <br />Inspection Start Time: 12:00 <br />Inspection End Date: September 14, 2016 <br />Inspection End Time: 17:00 <br /> <br /> <br />Inspection Type: Coal Complete Inspection <br />Inspection Reason: Normal I&E Program <br />Weather: Clear <br /> <br />Joint Inspection Agency: <br /> <br />None <br /> <br />Joint Inspection Contacts: <br /> <br /> <br />Post Inspection Agency: <br /> <br />None <br /> <br />Post Inspection Contacts: <br /> <br /> <br />Inspector(s): <br /> <br />Robin A. Reilley, GISP <br /> <br /> <br /> <br />Inspector’s Signature: Signature Date <br /> <br /> <br /> 22 September 2016 <br /> <br />