My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-19_PERMIT FILE - P2016019 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2016019
>
2016-09-19_PERMIT FILE - P2016019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 2:53:52 AM
Creation date
9/23/2016 10:33:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016019
IBM Index Class Name
PERMIT FILE
Doc Date
9/19/2016
Doc Name
Application
From
Viscount Resources
To
DRMS
Email Name
TC1
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 (FORM 2 -Public filing) <br /> 12. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br /> PLS/acre. For assistance with formulating seed mixtures and rates,contact the local NRCS if on private land.BLNt/USFS if <br /> on public land or State Land Board if on state land. <br /> A. Provide plant name and seeding rate <br /> Plant Name Seeding Rate(PLS/acre) <br /> blue grama 1.50 <br /> western wheatgrass 8.00 <br /> Arizona Fescue 2.50 <br /> Intermediate Wheatgrass 10.00 <br /> Mountain Bromegrass 10.00 <br /> Big Bluegrass 1.00 <br /> Cicer Milkvetch 6.00 <br /> B. Describe the method for seed bed preparation,and application method for grass/forb seeding: <br /> Replace topsoil. broadcast seed <br /> V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br /> 3. Reclamation measures shall be fulfilled in a timely manner and completed within five(5)years of completion of prospecting <br /> activities. <br /> 4. The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br /> In addition to the measures required in Rule 5,precautions to be taken include: <br /> A. Confinement of operations to areas near existing roads or trails,where practicable. Existing roads which are to remain as <br /> permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br /> prospecting condition; <br /> B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br /> stream channel. Drill cuttings must be spread to a depth no greater than one-half(1/2) inch or buried in an approved <br /> disposal pit; <br />
The URL can be used to link to this page
Your browser does not support the video tag.