Laserfiche WebLink
6 (FORM 2 -Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> Topsoil depth is 0-6 inches. We will attempt to stockpile the topsoil for reclamation, but it is <br /> hard to scrape off such a thin layer and segregate it from the underlying sand, silt, and <br /> bedrock, e is ri u ion depth will e about inches <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> Bottom of hole to 20 feet below surface will be filled with bentonite. The top 20 feet of the <br /> hole will be cemented. <br /> 10. Describe how portals,adits,shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> All cuttings pits will be refilled with excavated material once the standing water is gone. <br /> Leveled drillsites will be re-contoured to as close as possible to the original topography. <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> Na new reads will be constructed <br />