My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-19_PERMIT FILE - P2016019 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2016019
>
2016-09-19_PERMIT FILE - P2016019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 2:53:52 AM
Creation date
9/23/2016 10:33:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016019
IBM Index Class Name
PERMIT FILE
Doc Date
9/19/2016
Doc Name
Application
From
Viscount Resources
To
DRMS
Email Name
TC1
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 -Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> Topsoil depth is 0-6 inches. We will attempt to stockpile the topsoil for reclamation, but it is <br /> hard to scrape off such a thin layer and segregate it from the underlying sand, silt, and <br /> bedrock, e is ri u ion depth will e about inches <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> Bottom of hole to 20 feet below surface will be filled with bentonite. The top 20 feet of the <br /> hole will be cemented. <br /> 10. Describe how portals,adits,shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> All cuttings pits will be refilled with excavated material once the standing water is gone. <br /> Leveled drillsites will be re-contoured to as close as possible to the original topography. <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> Na new reads will be constructed <br />
The URL can be used to link to this page
Your browser does not support the video tag.