My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-19_REVISION - M2011013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011013
>
2016-09-19_REVISION - M2011013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:10 PM
Creation date
9/21/2016 12:34:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011013
IBM Index Class Name
REVISION
Doc Date
9/19/2016
Doc Name
Request for Technical Revision
From
Telluride Stone Company
To
DRMS
Type & Sequence
TR3
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EV)6D, <br /> E_c <br /> thQ�• fT.7Ii <br /> COLORADO DIVISION OF RECLAMATION, NIINING AND SAFETY <br /> * ` ' 1313 Sherman Street Room 215 Denver,Colorado 80203 h 303 866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- l01/ —013 Site Name: A/)jP©2r r(T/T <br /> S�W <br /> County 141&*UE1 VTR# s (DRMS Use onb) <br /> Permittee: I t GC��! fZ �T�71G� �P,q 41�c_ - RECEIVED <br /> Operator(If Other than Permittee): t/SEP 19 2016 <br /> Permittee Representative:_ E/t/ /`��0, - DIVISION OF RECLAMATION <br /> SAFETY��4MINING AND <br /> Please provide a brief description of the proposed revision: (/ / idol / <br /> - <br /> ,�a&U�n r42UW rtq-"& PZ19& <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 11 Od, 112d(l, 2 or 3) $1006 ❑ <br /> �l Annual Fee and Report -CW <br /> �1 No Violations <br />
The URL can be used to link to this page
Your browser does not support the video tag.