Laserfiche WebLink
F. <br /> be Transit Mix Concrete Co. <br /> Table G-4 <br /> Ditch Summary <br /> Bottom 100-hr, 24-hr Channel <br /> Name Width Si (H:V) a Slope peak Flow Depth Riprap Deo <br /> (ft) H:V) (%) (cfs) (ft) (in) <br /> Phases I -V <br /> Access Road Ditches 2 or 4 3:1 Up to 8% Up to 45.6 cfs 2.0 2" to 15" <br /> AR-1 thru 10 <br /> CWD-1 4 3:1 7.1% 37.07 1.3 8 <br /> CWD-2 4 3:1 2.5% 62.8 1.9 6 <br /> CWD-3 8 3:1 1.5% 315.95 3.25 9 <br /> CWD-4 4 3:1 8.0% 12.2 1.0 4 <br /> CWD-5 4 3:1 8.0% 20.4 1.1 6 <br /> CWD-6 4 3:1 2.9% 83.3 2.0 8 <br /> CWD-7 4 3:1 4.0% 46.8 1.6 8 <br /> DD-1 4 3:1 1.2% 159 1.7 8 <br /> DD-2 4 3:1 2.0% 74.2 1.2 6 <br /> DD-3 12 3:1 10.6% 226 1.7 15 <br /> DD-4 4 3:1 2.0% 113.4 2.4 8 <br /> Fla 0 3:1/10:1 2.0% 29 1.2 Vegetation <br /> Fla 4 3:1 33.0% 29 0.7 15 <br /> T-1 0 3:1/10:1 1.0% 15.7 1.2 Vegetation <br /> T-2 0 3:1/10:1 1.0% 17.4 1.2 Vegetation <br /> T-3 0 3:1/10:1 1.0% 20.1 1.3 Vegetation <br /> Phase Reclaim <br /> DD-F1 b 8 3:1 1.0% 188.03 2.8 5 <br /> DD-F1-1 8 31 18.0% 188.03 1.7 24 <br /> DD-SP-la 8 3:1 5.0% 185.7 2.1 12 <br /> DD-SP-1 b 8 3:1 4.0% 360.7 3.0 16 <br /> DD-NP-la 8 3:1 3.0% 180.2 2.3 9 <br /> DD-NP-lb 8 3:1 2.0% 273.8 2.9 9 <br /> DD-NP-lc 8 3:1 2.0% 392.9 3.4 12 <br /> DD-F2-1 4 3:1 8.0% 36.0 1.5 8 <br /> DD-172-2 8 3:1 20.0% 69.7 1.2 14 <br /> DD-F3-1 4 3:1 2.0% 37.1 1.6 4 <br /> Hitch Rack Ranch Quarry Permit Application M-2016-010 <br /> September 15, 2016 G-16 <br />