Laserfiche WebLink
�t - <br /> �o' o Transit Mix Concrete Co. <br /> of freeboard equal. The typical terrace ditch depth is two feet. A typical cross-section for terrace <br /> ditches is shown in Figure G-13. <br /> ii. Ditch Designs <br /> The designs for clean water ditches, road ditches, and down drain ditches are based on <br /> calculated peak flow rates. Ditches have been included along the edges of the overburden and <br /> fines stockpile, where a ditch naturally forms or along roads, and at the boundary between native <br /> and disturbed areas. <br /> Road ditches and clean water ditches are typically trapezoidally-shaped to maintain non-erosive <br /> velocities. The ditch side slopes are 3H:1 V, and the gradients are typically less than 10%. <br /> Riprap armoring is required in areas where ditches are constructed in unconsolidated materials, <br /> for steeper segments, and segments with high flows where the flow velocity exceeds the erosion <br /> threshold of five feet per second. Due to the site conditions, the ditches in the upper reaches of <br /> the site area and along the access road will be excavated into bedrock. Thus, no riprap will be <br /> required for these ditches. Each ditch will be evaluated on-site to determine whether bedrock <br /> provides sufficient armoring or if riprap will be required. Table G-4 presents the values assuming <br /> that no bedrock were encountered. <br /> The down drain ditches will be trapezoidal in shape with at least a 4-ft bottom width and 3HAV <br /> side slopes. These ditches typically have high grades (up to 18%) and require riprap armoring. <br /> Riprap sizing for channel armoring were determined using a combination of the SEDCAD <br /> program to determine the peak flow, the Hydraulic Toolbox program, Version 4.2 from the <br /> Federal Highway Administration, to determine the anticipated velocity for the channel, and the <br /> USACE EM 1110-2-1601 method for 2% to 20% slopes and the Simons/OSM method in <br /> SEDCAD for slopes steeper than 20%. The ditches have been designed to convey runoff from <br /> the 100-year, 24-hour storm event with no erosion and a minimum freeboard of 0.5 foot. Table <br /> G-4 shows the specifications for each of the ditches. A typical cross-section for ditches is shown <br /> in Figure G-13, and the design reports are included in Attachment G-1. <br /> Ditch CWD-3 is the by-pass ditch to convey unimpacted drainage from the upstream watershed <br /> and convey it through or around the disturbed area. Below sediment detention basin P-DET-1, <br /> the flow is conveyed in the channel. Runoff from the south flows in the channel and the runoff <br /> from the disturbed area to the east is limited by the outslope berm and the grading of the fines <br /> pad toward ditch DD-1. As the pile develops, the outslope of the pile will be contemporaneously <br /> reclaimed to minimize the sediment contributed to the by-pass channel. <br /> Hitch Rack Ranch Quarry Permit Application M-2016-010 <br /> September 15, 2016 G-15 <br />