My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-01_PERMIT FILE - C1981010A (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2016-08-01_PERMIT FILE - C1981010A (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 11:41:47 AM
Creation date
9/19/2016 9:38:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
8/1/2016
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix A Reclamation Cost Estimate
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper vs Truck. ap of Kcift PKs <br />SCRAPER VS TRUCK REGRADE OF K-GDIP PITS <br />Talpac <br />Production <br />Haulage System: Scraper Topsoil KLM 2014 WCB <br />Haul Cycle: [PRJ) Al -08 <br />Material:PRJLoader Tpesoll <br />Roster PRJ 5 darA Week - S Hour Shifts <br />Availability <br />% <br />` <br />85.00 <br />Bucket Fill Factor <br />0.85 <br />Average Bucket Load Volume <br />cu.yards <br />27.05 <br />Average Payload <br />bcy <br />22.54 <br />Operating Hours per Year <br />OpHr/Year <br />2,653.00 Op. hrs factored by avaiiabiuty <br />Average Operating Shifts per Year <br />shifts/Year <br />379.00 Shifts factored by availability <br />Average Bucket Cycle Time <br />min <br />1,80 <br />Loaded Transport Time <br />min <br />1.23 <br />Unloaded Transport Time <br />min <br />0.41 <br />Total Loading unit Cycle Time <br />min <br />1,84 <br />Transport Distance (One Way) <br />feet <br />910.00 <br />Production per Operating Hour <br />bcy <br />223.05 <br />Production per Loader Operating Shift <br />bcy <br />1,561 Max, prod. based on 10096 avail. <br />Production Per Year <br />bcv <br />891,743 AvQ. Production factored by aval. <br />Production per Year <br />bcy/Year <br />591,743 <br />Discounted Capital Cost <br />$/bcy <br />0.00 Loading Methodology <br />Discounted Operating Cost <br />$/bcy <br />0.00 Single Sided <br />Discounted Average Cost <br />$/bcy <br />0.00 Full Bucket <br />Excavation Target <br />bcy <br />22$,206.00 Average for 150 Shifts <br />Time to move Excavation Target <br />Days <br />140.86 <br />Loader Hrs to move Target <br />Op. Hours. <br />1,023 <br />Total Truck Hrs to move Target <br />Op. Hours. <br />1,023 <br />Total cost to move Target <br />$ <br />0 <br />Productivity estimates allow for insufficient time at the and of the shift to complete another cycle. <br />Time for the first bucket pass coincides with the <br />truck queuing and maneuvering times. <br />Equipment data should be checked to ensure it is valid for this site. <br />Prepared by: Xim Cummins <br />.Trapper Mining Inc. <br />7 -May -201311:55 AM Pagel <br />
The URL can be used to link to this page
Your browser does not support the video tag.