Table A-12.1 (Cont.) Demolition - Structures Page No. 34
<br />Struckture or Item Description
<br />Dimensions
<br />Demoliton Menu Selection
<br />Quami
<br />Unit
<br />'Unit Cost
<br />Total Cost
<br />Bldg. (SC) demo./on-site
<br />disposal in existing pit or cut -
<br />Light Duty & Elect. Shop
<br />94,500
<br />Max. 10,000 ft, haul
<br />94,500
<br />CF
<br />$ 0.21
<br />$ 20,223.00
<br />Floor, concrete, demoliton only,
<br />Concrete floor
<br />5,250
<br />average reinforcing -6 in. thick
<br />5,250
<br />SF
<br />$ 1.55
<br />$ 8,137.50
<br />Demo. And on -site disposal in
<br />existing pit, 1.0 ft. X 2 ft.- Max.
<br />Footers
<br />348
<br />10,000 ft. haul
<br />348
<br />LF
<br />$ 6.41
<br />$ 2,230.68
<br />Pavement, bituminous,
<br />Break up and bury Parking Lot
<br />demoliton only - 4in. To 6 in.
<br />Asphalt
<br />2,448
<br />thick
<br />2,448
<br />SY
<br />$ 6.41
<br />$ 15,691.68
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Water Tank
<br />80,000 gal.
<br />Max. 10,000 ft. haul
<br />10,667 1
<br />CF
<br />$ 0.171$
<br />1,792.06
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Water Tank
<br />80,000 gal.
<br />Max. 10,000 ft. haul
<br />10,667
<br />CF
<br />$ 0.17
<br />$ 1,792.06
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Diesel Tank
<br />100,000 gal.
<br />Max. 10,000 ft. haul
<br />13,333
<br />CF
<br />$ 0.17
<br />$ 2,239.94
<br />Bldg. (SN) demotion -site
<br />disposal in existing pit or cut -
<br />Diesel Tank
<br />100,000 gal
<br />Max. 10,000 ft. haul
<br />13,333
<br />CF
<br />$ 0.17
<br />$ 2,239.94
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Diesel Tank
<br />20,000 gal.
<br />Max. 10,000 ft. haul
<br />2,667
<br />CF
<br />$ 0.17
<br />$ 448.06
<br />Bldg. (SN) demo /on-site
<br />disposal in existing pit or cut -
<br />Diesel Tank
<br />20,000 gal.
<br />Max. 10,000 ft haul
<br />2,667
<br />CF
<br />$ 0.17
<br />$ 448.06
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Diesel Tank
<br />20,000 gal.
<br />Max. 10,000 ft, haul
<br />2,667
<br />CF
<br />$ 0.17
<br />$ 448.06
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Water Tank
<br />20,000 gal.
<br />Max. 10,000 ft. haul
<br />2,667
<br />CF
<br />$ 0.17
<br />$ 448.06
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Water Tank
<br />20,000 gal.
<br />Max. 10,000 ft. haul
<br />2,667
<br />CF
<br />$ 0.17
<br />$ 448.06
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Gasoline Tank
<br />15,000 gal.
<br />Max. 10,000 ft. haul
<br />2,000
<br />CF
<br />$ 0.17
<br />$ 336.00
<br />Floor, concrete, demoliton only,
<br />Concrete pads for Storage Tank
<br />6,500
<br />average reinforcing -6 in, thick
<br />6,500
<br />SF
<br />$ 1.55
<br />$ 10,075.00
<br />Remove sludge, water, and
<br />rem. Product form tank - 6000
<br />Fuel Tank Sludge Removal
<br />6300 gal.
<br />to 8000 gal.
<br />1
<br />EA
<br />$ 271.00
<br />$ 271.00
<br />Hazardous waste removal -
<br />Bulk liquids, large quantities
<br />Disposal of Tank Sludge
<br />26 Tons
<br />(over 2,500 gal.)
<br />6,300
<br />Gal.
<br />$ 1.791$
<br />11,277.00
<br />Poweriine or telephone line,
<br />Powerlines
<br />50,000
<br />overhead, wood -Single pole
<br />50,000
<br />LF
<br />$ 2.60
<br />$ 129,900.00
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Tire Shed - Skid Mounted
<br />6,000
<br />Max. 10,000 ft. haul
<br />6,000
<br />CF
<br />$ 0.17
<br />$ 1,008.00
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />Main Substation
<br />6,000
<br />Max. 10,000 ft. haul
<br />6,000
<br />CF
<br />$ 0.17
<br />$ 1,008.00
<br />Floor, concrete, demoliton only,
<br />Concrete pads
<br />1,200
<br />average reinforcing -6 in. thick
<br />1,200
<br />1 SF
<br />$ 1.551
<br />$ 1,860.00
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut -
<br />4 Portables
<br />4,200
<br />Max. 10,000 ft. haul
<br />4,200
<br />CF
<br />$ 0.17
<br />$ 705.60
<br />Bldg. (SN) demo./on-site
<br />disposal in existing pit or cut-
<br />ANFO Silos and Emulsion Tank
<br />10,940
<br />Max. 10,000 ft. haul
<br />10,940
<br />CF
<br />$ 0.17
<br />$ 1,837.92
<br />P.