Laserfiche WebLink
Table A-12.1 (Cont.) Demolition - Structures Page No. 34 <br />Struckture or Item Description <br />Dimensions <br />Demoliton Menu Selection <br />Quami <br />Unit <br />'Unit Cost <br />Total Cost <br />Bldg. (SC) demo./on-site <br />disposal in existing pit or cut - <br />Light Duty & Elect. Shop <br />94,500 <br />Max. 10,000 ft, haul <br />94,500 <br />CF <br />$ 0.21 <br />$ 20,223.00 <br />Floor, concrete, demoliton only, <br />Concrete floor <br />5,250 <br />average reinforcing -6 in. thick <br />5,250 <br />SF <br />$ 1.55 <br />$ 8,137.50 <br />Demo. And on -site disposal in <br />existing pit, 1.0 ft. X 2 ft.- Max. <br />Footers <br />348 <br />10,000 ft. haul <br />348 <br />LF <br />$ 6.41 <br />$ 2,230.68 <br />Pavement, bituminous, <br />Break up and bury Parking Lot <br />demoliton only - 4in. To 6 in. <br />Asphalt <br />2,448 <br />thick <br />2,448 <br />SY <br />$ 6.41 <br />$ 15,691.68 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />Water Tank <br />80,000 gal. <br />Max. 10,000 ft. haul <br />10,667 1 <br />CF <br />$ 0.171$ <br />1,792.06 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />Water Tank <br />80,000 gal. <br />Max. 10,000 ft. haul <br />10,667 <br />CF <br />$ 0.17 <br />$ 1,792.06 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />Diesel Tank <br />100,000 gal. <br />Max. 10,000 ft. haul <br />13,333 <br />CF <br />$ 0.17 <br />$ 2,239.94 <br />Bldg. (SN) demotion -site <br />disposal in existing pit or cut - <br />Diesel Tank <br />100,000 gal <br />Max. 10,000 ft. haul <br />13,333 <br />CF <br />$ 0.17 <br />$ 2,239.94 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />Diesel Tank <br />20,000 gal. <br />Max. 10,000 ft. haul <br />2,667 <br />CF <br />$ 0.17 <br />$ 448.06 <br />Bldg. (SN) demo /on-site <br />disposal in existing pit or cut - <br />Diesel Tank <br />20,000 gal. <br />Max. 10,000 ft haul <br />2,667 <br />CF <br />$ 0.17 <br />$ 448.06 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />Diesel Tank <br />20,000 gal. <br />Max. 10,000 ft, haul <br />2,667 <br />CF <br />$ 0.17 <br />$ 448.06 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />Water Tank <br />20,000 gal. <br />Max. 10,000 ft. haul <br />2,667 <br />CF <br />$ 0.17 <br />$ 448.06 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />Water Tank <br />20,000 gal. <br />Max. 10,000 ft. haul <br />2,667 <br />CF <br />$ 0.17 <br />$ 448.06 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />Gasoline Tank <br />15,000 gal. <br />Max. 10,000 ft. haul <br />2,000 <br />CF <br />$ 0.17 <br />$ 336.00 <br />Floor, concrete, demoliton only, <br />Concrete pads for Storage Tank <br />6,500 <br />average reinforcing -6 in, thick <br />6,500 <br />SF <br />$ 1.55 <br />$ 10,075.00 <br />Remove sludge, water, and <br />rem. Product form tank - 6000 <br />Fuel Tank Sludge Removal <br />6300 gal. <br />to 8000 gal. <br />1 <br />EA <br />$ 271.00 <br />$ 271.00 <br />Hazardous waste removal - <br />Bulk liquids, large quantities <br />Disposal of Tank Sludge <br />26 Tons <br />(over 2,500 gal.) <br />6,300 <br />Gal. <br />$ 1.791$ <br />11,277.00 <br />Poweriine or telephone line, <br />Powerlines <br />50,000 <br />overhead, wood -Single pole <br />50,000 <br />LF <br />$ 2.60 <br />$ 129,900.00 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />Tire Shed - Skid Mounted <br />6,000 <br />Max. 10,000 ft. haul <br />6,000 <br />CF <br />$ 0.17 <br />$ 1,008.00 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />Main Substation <br />6,000 <br />Max. 10,000 ft. haul <br />6,000 <br />CF <br />$ 0.17 <br />$ 1,008.00 <br />Floor, concrete, demoliton only, <br />Concrete pads <br />1,200 <br />average reinforcing -6 in. thick <br />1,200 <br />1 SF <br />$ 1.551 <br />$ 1,860.00 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut - <br />4 Portables <br />4,200 <br />Max. 10,000 ft. haul <br />4,200 <br />CF <br />$ 0.17 <br />$ 705.60 <br />Bldg. (SN) demo./on-site <br />disposal in existing pit or cut- <br />ANFO Silos and Emulsion Tank <br />10,940 <br />Max. 10,000 ft. haul <br />10,940 <br />CF <br />$ 0.17 <br />$ 1,837.92 <br />P. <br />