Laserfiche WebLink
Table A-12.1 Demolition - Structures Page No. 33 <br />Struckture or Item Description <br />Dimensions <br />Demoiiton Menu Selection <br />guanti <br />Unit <br />'Unit Cost <br />Total Cost <br />Bldg. (MN) demotion -site <br />disposal in existing pit or cut - <br />Main Office <br />317548 CF <br />Max. 10,000 ft. haul <br />317,548 <br />CF <br />$ 0.20 <br />$ 62,239.41 <br />Floor, concrete, demoliton only, <br />Office Bldg. floor <br />15,288 <br />average reinforcing -10 in. thick <br />15,288 <br />SF <br />$ 2.58 <br />$ 39,443.04 <br />Demo. And onsite disposal in <br />Reinforced concrete floor office <br />existing pit, 12 in. thick -Max. <br />bldg. <br />251 <br />10,000 ft haul <br />251 <br />SF <br />$ 3.20 <br />$ 803.20 <br />Demo. And on -site disposal in <br />existing pit, 1.5 ft X 2 ft.- Max. <br />Office footers <br />804 <br />10,000 ft. haul <br />804 <br />LF <br />$ 9.60 <br />$ 7,718.40 <br />Fencing, chain link, including <br />posts and fabric -8 ft. to 10 ft. <br />Remove fencing <br />500 <br />high <br />500 <br />LF <br />$ 2.74 <br />$ 1,370.00 <br />Bldg. (MN) demo./on- <br />sitedisposal in existing pit or <br />Shop/Warehouse <br />1,925,700 <br />cut -Max. 10,000 ft. haul <br />1,925,700 <br />CF <br />$ 0.20 <br />$ 377,437.20 <br />Floor, concrete, demoliton only, <br />Warehouse concrete floor <br />9,270 <br />average reinforcing -12 in. thick <br />9,270 <br />SF <br />$ 3.10 <br />$ 28,737.00 <br />Floor, concrete, demoliton only, <br />Warehouse 4" concrete floor <br />7,925 <br />average reinforcing -4 in. thick <br />7,925 <br />SF <br />$ 1.03 <br />$ 8,162.75 <br />Demo. And on -site disposal in <br />existing pit, 1.5 ft. X 2 ft, Max. <br />Warehouse footers <br />1,822 <br />10,000 ft. haul <br />1,822 <br />LF <br />$ 9.60 <br />$ 17,491.20 <br />Bldg. (SN) demo./on- <br />sitedisposal in existing pit or <br />Silver Storage Trailer <br />40X10X10 <br />cut -Max. 10,000 ft. haul <br />4,000 <br />CF <br />$ 0.17 <br />$ 672.00 <br />Bldg. (SN) demo./on- <br />sdedisposal in existing pit or <br />Bldg. Caterpillar parts trailer <br />35X10X8 <br />cut -Max. 10,000 ft. haul <br />2,800 <br />CF <br />$ 0.17 <br />$ 470.40 <br />Bldg. (MN) demotion -site <br />disposal in existing pit or cut- <br />Wash/Lube Bay <br />173,500 <br />Max. 10,000 ft. haul <br />173,500 <br />CF <br />$ 0.20 <br />$ 34,006.00 <br />Floor, concrete, demoliton only, <br />Wash Bay Concrete floor <br />9,275 <br />average reinforcing -6 in. thick <br />9,275 <br />SF <br />$ 1.55 <br />$ 14,376.25 <br />Demo. And on -site disposal in <br />existing pit, 1.0 ft. X 2 ft, Max. <br />Wash Bay Footers <br />480 <br />10,000 ft. haul <br />480 <br />LF <br />$ 6.41 <br />$ 3,076.80 <br />Floor, concrete, demoliton only, <br />Shop Concrete floor <br />2,400 <br />average reinforcing -6 in. thick <br />2,400 <br />SF <br />$ 1.55 <br />$ 3,720.00 <br />Demo. And on -site disposal in <br />existing pit, 1.0 ft. X 2 ft.- Max. <br />Shop footers <br />290 <br />10,000 ft. haul <br />290 <br />LF <br />$ 6.41 <br />$ 1,858.90 <br />Bldg. (MN) demo./on-site <br />disposal in existing pit or cut - <br />Seed trailer <br />30X10X8 <br />Max. 10,000 ft. haul <br />2,400 <br />CF <br />$ 0.20 <br />$ 470.40 <br />Bldg (MN) demotion -site <br />disposal in existing pit or cut - <br />Pump House <br />4,840 <br />Max. 10,000 ft. haul <br />4,840 <br />CF <br />$ 0.20 <br />$ 948.64 <br />Bldg. (MN) demo./on-site <br />disposal in existing pit or cut - <br />Pump House floor <br />484 <br />Max. 10,000 ft. haul <br />484 <br />SF <br />$ 1.55 <br />$ 750.20 <br />Demo. And on -site disposal in <br />existing pit, 1.0 ft. X 2 ft: Max. <br />Pump House footers <br />88 <br />10,000 ft. haul <br />88 <br />LF <br />$ 6.41 <br />$ 564.08 <br />Bldg. (SC) demo./on-site <br />Old cars & equipment at water <br />disposal in existing pit or cut - <br />tanks <br />120X10X4 <br />Max. 10,000 ft. haul <br />4,800 <br />CF <br />$ 0.21 <br />$ 1,027.20 <br />